CountyFL
Posted
Oct 4, 2026
Nov 4, 2026
Avenue M New Entrance Road & Stormwater Pipeline Relocation at Harbour Pointe
Work includes new entrance road & stormwater pipeline relocation.
Description: Work inlcudes excavation of underground concrete structures, and the construction of a stormwater system which consists of pipes, inlets/drains, a swale, grass, and the planting of bamboo along certain portions of the properties, and related appurtenant work.
City · FL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyFL
Posted
Oct 4, 2026
Nov 4, 2026
Work includes new entrance road & stormwater pipeline relocation.
FederalDC
Posted
Sep 9, 2026
Oct 20, 2026
Montgomery Parks is seeking qualified contractors to perform construction work at Georgia Avenue and Evans Parkway/Evans Drive. The project includes a protected pedestrian crossing and a High Intensity Activated Crosswalk (HAWK) signal within Maryland State Highway Administration right of way. It is part of an M-NCPPC Safe Streets for All grant funded by the United States Department of Transportation, but this solicitation seeks construction bids, not grant applications.
University Of Illinois At Urbana Champaign
Higher EducationIL
Posted
-
Nov 10, 2026
Work includes selective demolition and abatement, conversion of existing multi-user restrooms into multiple single-user toilet and shower rooms, new lavatories, floor leveling, concrete/core work, and structural frp reinforcing, partitions, ceilings, doors, hardware, finishes, signage, and accessories, and associated plumbing, ventilation, electrical, lighting, fire alarm, and fire protection work.
CityPA
Posted
Sep 22, 2026
Nov 5, 2026
Work include 2,224 CY Excavation and disposal; 468 CY Excavation, without classification (for pipe); 35 LF 8 inch solid HDPE pipe; 435 LF 8 inch perforated HDPE pipe; 116 LF 12 inch perforated PP pipe; 329 LF 8 inch DI pipe; 1,398 CY Furnish and place AASHTO #57 stone wrapped in geotextile; 752 SY Impermeable geomembrane Liner; 135 LF 15 inch inlet connections; 878 LF Concrete curb; 1,064 SY 4" concrete footway paving.
Decision makers connected to this RFP from City of Cape Canaveral.