Open RFP

Pw Prequal Bid 2921 -Construction of Green Stormwater Infrastructure in Upland Way

Description: Work include 2,224 CY Excavation and disposal; 468 CY Excavation, without classification (for pipe); 35 LF 8 inch solid HDPE pipe; 435 LF 8 inch perforated HDPE pipe; 116 LF 12 inch perforated PP pipe; 329 LF 8 inch DI pipe; 1,398 CY Furnish and place AASHTO #57 stone wrapped in geotextile; 752 SY Impermeable geomembrane Liner; 135 LF 15 inch inlet connections; 878 LF Concrete curb; 1,064 SY 4" concrete footway paving.

Buyer
City of Philadelphia

City · PA, US

Released
Sep 22, 2026
Closes
Nov 5, 2026(28 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts