Potable Water Distribution System Improvements - Contract D - Division Street Water Main Replacement
Project consists of supplying the labor, equipment, and materials necessary to provide approximately 478 LF of new 24-inch diameter ductile water main, 67 LF of new 24-inch diameter of HDPE pipe, 750 LF of new 16-inch diameter water main, 155 LF of new 8-inch diameter water main, and 248 LF of new 36-inch diameter steel casing pipe. Also included are related valves, pavement replacement, site work, seeding, bore and jack, directional drilling, and other services and items of construction.