RFP#FY26-015 Non-Potable Pump Station Rehabilitation Design
Description: The City of Evans is seeking a professional engineering firm to design rehabilitation upgrades to an existing non-potable pump station. The station draws raw irrigation water from a nearby storage pond. The solicitation was published on November 10, 2026, and proposals are due December 8, 2026.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
440 days before RFP
Public Works staff reported severe Ridge non-potable pump-station deterioration, including failed pumps, lost redundancy, and destroyed filtration.
See sourceHide source
I also bring up um you know the the the nonpot system. So we have uh I think that's the ridge pump station where where I pulled the ridge pump station. We've had you know we have we have pumps that have gone out. Um we had a consultant out there doing a a diagnostics under emergency bid waiver and he said it's the worst pump station he's ever seen. In that…
City Manager Cody R. Sims reported that the City had budgeted $600,000 for 2026 Ridge pump-station irrigation improvements and directed engineering to define a potential complete rehabilitation or reconstruction.
See sourceHide source
this we have in our budget for 2026 we have $600,000 budgeted for irrigation improvements for uh the ridge pump station. Now $600,000 what I've directed my team to do is start working on the engineering to get that taken care of to get the engineering started on that. Um as we shared during the budget discussion uh here just a little bit ago there's going…
Agenda packet
70 days before RFP
The work-session presentation proposed $1,000,000 for 2027 Ridge Pond Pump Station Construction within $2,215,000 of proposed water-project adoption.
Engineering prepared an RFP scope to evaluate Ridge Pond non-potable pump-station deficiencies and recommend long-term reliability and performance improvements, with issuance expected by the end of October 2026.
See 2 sourcesHide sources
Ridge Pond Pump Station Status: Request for Proposals The failed variable frequency drive (VFD) was replaced on July 23, 2026, restoring non- potable irrigation service to The Ridge and Willowbrook subdivisions. Staff continues to monitor the pump station to ensure reliable operation during periods of high daytime temperatures and increased irrigation…
Ridge Pond Pump Station, the Engineering team is preparing a scope of work to select a design consultant to evaluate the Ridge Pond non- potable water system and identify long-term improvements. The scope of work is currently undergoing internal review to ensure all aspects of the system are appropriately evaluated before a Request for Proposals (RFP) is…
The project scope includes rehabilitation of the existing Patterson Pump Station including mobilization and demobilization, bypass pumping, demolition of facilities to be removed, excavation and grading, structural rehabilitation of the wet well and Grinder Room, modifications to the bridge crane canopy, installation of slide gates, a carbon filter odor control system and associated ductwork, gravity sewer with new Diversion Structure, recoating of all piping in the wet well and valve vault, generator enclosure, and existing surge tank, associated site improvements and other facility upgrades per contract documents including site concrete paving, site fencing, an asphalt access driveway, finish grading, erosion control
and site stabilization.
Dallas Fort Worth International Airport is soliciting a lump-sum construction contract for rehabilitation of the East Potable Water Pump Station. The opportunity is identified as PA1902 and listed under Design, Code and Construction, with an independent estimate of $22,064,975. The posting includes project plans, specifications, and ROCIP 4.0 documents, and closes on January 7, 2027.
The City of Port Huron is seeking a contractor to rehabilitate the Holland Avenue sanitary sewer pump station. The work includes replacing three pumps and related equipment, rebuilding the valve vault and station building, and updating electrical systems, level controls, SCADA, and the transformer. It also includes site work while maintaining station flow.
Project consists of electrical rehabilitation and a building addition at pump station 16A. Major work includes a new MCC, standby generator, automatic transfer switch, pump discharge control valves and electric actuators, HVAC, and all associated electrical, structural, civil, and architectural improvements as set forth in the contract documents.