Retrieving RFP details
Release
Close
City of Monterey Park
The bid is for a public works project that consists of the removal & repair of 29 ADA ramps.
Town of Phillipsburg
2025 Road Program. Improvements include reconstruction of curbing, sidewalk, and asphalt to reconstruct ADA compliant curb ramps.
City of Monterey
Work consist of 5,790 SF of remove concrete curb and gutter, sidewalk, curb ramp, sidewalk crossing, and driveway, 2 EA of salvage parking meter, 41,000 SF of remove ac pavement and base, 150 SF of remove ac dike, 1,300 SF of salvage and reinstall aggregate walkway, 2 EA of reconstruct storm drain inlet (precast curb opening EA), 6 EA of reconstruct storm drain inlet (combination inlet), 15 EA of adjust valve cover to grade, 2 EA of adjust utility box to grade, 2 EA of adjust flushing inlet to grade, 2 EA of adjust manhole cover to grade, 1 EA of replace manhole cone and adjust cover to grade, 2 EA of reinstall wheel stop. See attache file.
City of Alexandria
Street ramp improvements project.
Release
Oct 21, 2025
Close
Nov 18, 2025