Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approximately 1,880 linear feet of 8-inch PVCO water main and 15 linear feet of 8-inch ductile iron water main and appurtenances at #2024 West Henrietta Road, Town of Brighton.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableProject consists of 0.43 miles of 12" water main replacement,the installation of concrete sidewalk in gap areas where no sidewalk currently exists and misc. Related items of work.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Project consists of 0.43 miles of 12" water main replacement,the installation of concrete sidewalk in gap areas where no sidewalk currently exists and misc. Related items of work.
AvailableReplacement of approx. 652 LF of water main and all associated appurtenances.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Replacement of approx. 652 LF of water main and all associated appurtenances.
AvailableWork consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis