Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableWater main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
Posted Date
Dec 14, 2025
Due Date
Jan 20, 2026
Release: Dec 14, 2025
Close: Jan 20, 2026
Water main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
AvailableApprox., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Approx., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis