Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Clawson
Work includes 100' gas main, rem; 75 CY trench undercut and backfill; 12 EA gate valve, 8"; 11 EA gate well, rem; 10 EA hydrant, rem; 4,224' water main, di, 8 inch, tr det g; 362' water main, di, 8 inch, tr det g; 44 EA water serv; 53 EA water serv, long; 13 EA gate well, 60 inch dia; 10' water main, rem; 11 EA fire hydrant assembly; 2 EA water main connection, 12"; 4 EA water main connection, 6"; 6 EA water main connection, 8"; 36 EA tree, rem, 19" to 36"; 35 EA tree, rem, 6" to 18"; 665' sewer, rem, less than 24"; 136' sewer, rem, 24" to 48"; 2,900 SY sidewalk, rem; 1,750 SY driveway, rem; 13,800 SY pavt, rem, modified. See outside link for more.
Posted Date
May 28, 2026
Due Date
Jun 24, 2026
Release: May 28, 2026
City of Clawson
Close: Jun 24, 2026
Work includes 100' gas main, rem; 75 CY trench undercut and backfill; 12 EA gate valve, 8"; 11 EA gate well, rem; 10 EA hydrant, rem; 4,224' water main, di, 8 inch, tr det g; 362' water main, di, 8 inch, tr det g; 44 EA water serv; 53 EA water serv, long; 13 EA gate well, 60 inch dia; 10' water main, rem; 11 EA fire hydrant assembly; 2 EA water main connection, 12"; 4 EA water main connection, 6"; 6 EA water main connection, 8"; 36 EA tree, rem, 19" to 36"; 35 EA tree, rem, 6" to 18"; 665' sewer, rem, less than 24"; 136' sewer, rem, 24" to 48"; 2,900 SY sidewalk, rem; 1,750 SY driveway, rem; 13,800 SY pavt, rem, modified. See outside link for more.
AvailableCity of Clawson
Work include 107" Sewer, Rem, Less than 24 inch; 679 SY Pavt, Rem; 25 CY Subgrade Undercutting, Type IV; 150 SY Aggregate Base, 4"; 650 SY Aggregate Base, 8"; 580 SY Geotextile, Stabilization; 107' Video Taping Sewer and Culv Pipe; 8' Sewer Repr, Cl IV, 18 inch, Tr Det B; 2 EA Dr Structure, 48" dia; 2 EA Dr Structure Trap, 12"; 319' Underdrain, Subgrade, Open-Graded, 6"; 70 SY HMA Surface, Rem; 63 SY Conc Pavt, Misc, Nonreinf, 11"; 190 SY Surface Restoration, Seeding. See outside link for more.
Posted Date
-
Due Date
Jun 17, 2026
City of Clawson
Close: Jun 17, 2026
Work include 107" Sewer, Rem, Less than 24 inch; 679 SY Pavt, Rem; 25 CY Subgrade Undercutting, Type IV; 150 SY Aggregate Base, 4"; 650 SY Aggregate Base, 8"; 580 SY Geotextile, Stabilization; 107' Video Taping Sewer and Culv Pipe; 8' Sewer Repr, Cl IV, 18 inch, Tr Det B; 2 EA Dr Structure, 48" dia; 2 EA Dr Structure Trap, 12"; 319' Underdrain, Subgrade, Open-Graded, 6"; 70 SY HMA Surface, Rem; 63 SY Conc Pavt, Misc, Nonreinf, 11"; 190 SY Surface Restoration, Seeding. See outside link for more.
AvailableCity of Clawson
Work includes approx 23 LF 12" PVC SDR26 storm sewer; 2,080 LF 8" DI class 54 water main by directional bore; 500 LF irrigation pipe; 1,290 Lf 6" concrete sidewalk.
Posted Date
Mar 11, 2026
Due Date
Mar 25, 2026
Release: Mar 11, 2026
City of Clawson
Close: Mar 25, 2026
Work includes approx 23 LF 12" PVC SDR26 storm sewer; 2,080 LF 8" DI class 54 water main by directional bore; 500 LF irrigation pipe; 1,290 Lf 6" concrete sidewalk.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $1,000, use sole source.
Coops: Lead with a cooperative contract your product is on; ask Purchasing to validate and proceed to bypass formal bidding.
City of Clawson (MI) applies high scrutiny to sole source; non-proprietary requests are typically rejected. Use only when the product is truly unique and proprietary.
Board meetings and strategic plans from City of Clawson
The meeting included discussions about a restaurant group focused on promotion and events to establish Clawson as a dining destination. Plans were discussed for a springtime open-air fair, weekly and monthly promotions, and a restaurant week. The meeting also covered a project to improve the pedestrian alley between Sabbath Coffee and the Avery Hassler building, including lighting, artwork, plantings, and seating. Changes to the DDA bylaws were reviewed and approved.
The meeting included a pledge of allegiance and words of inspiration from a community member. A personal point was raised regarding comments on Facebook about Clawson Fest 2025. The council discussed a request to rezone a property on North Main Street from office service and single-family residential to core residential, with presentations from city staff and planning consultants.
The meeting included discussions regarding the library's budget, including revenues from property tax millage rates and expenditures. There was also discussion about peg funds and their allocation to different departments. The board discussed rearranging furniture and the agenda, as well as upcoming events such as the Wednesday Afternoon Blog Book Club, Chapter Chat, and a Michigan holiday season memories program. Other topics included online story time, the upcoming Dinovember event, holiday closures, children's programs, publicity, community outreach, and updates on the library's heating and cooling system. The board also discussed staff evaluations, staffing levels, and potential changes in the future.
The meeting included a roll call and the Pledge of Allegiance. The consent agenda, consisting of the September 2025 regular meeting minutes, was approved with a roll call vote after a request to include Council Maruchcci's name in the minutes. Financial reports were reviewed, with discussion focusing on portaotti rentals from the farmers market and candy purchases. Officer elections were held, with nominations for chairperson and vice chairperson. There was a lengthy discussion regarding potential conflicts of interest related to the chairperson position, involving the roles of city council members and business owners. The discussion also touched on the importance of relationships between the city, council, and local businesses, as well as the need for unity and collaboration.
The meeting involved a discussion and consideration of a site plan approval for 516 North Main Street. Key points included compliance with zoning standards, the Planned Unit Development agreement, setbacks, parking spaces, building design, landscaping, signage, lighting, and pedestrian and vehicular circulation. Revisions were discussed regarding sidewalk dimensions, tree spacing, and the relocation of a light pole. Concerns from a neighboring property owner were addressed, including the placement of the dumpster, windows on the east side of the building, and drainage. The applicant addressed questions and concerns, expressing compliance with staff requests and seeking approval.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Clawson's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant City Manager / Director of Community and Economic Development
Premium
Access the largest public sector contact database
© 2026 Starbridge