Omaha Metropolitan Entertainment and Convention Authority
Special DistrictNE
Jul 14, 2026
Closes
Aug 5, 2026
Chilled Water Valve Replacement at CHI Health Center Omaha RFP
Chilled water valve replacement.
Description: This Request for Proposal/Qualifications for Construction Management (RFQP-CM-0269-2023) is being issued by Georgia Institute of Technology for the chilled water distribution system replacement from the Klaus Advanced Computing Building to the College of Computing on the Georgia Tech campus in Atlanta, Georgia. The project aims to replace aging infrastructure and enhance the chilled water piping network to improve system resiliency across the campus. Construction documents are expected to be completed by August 2026, with proposals due July 29, 2026.
HigherEducation · GA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Georgia Institute Of Technology.
Adjacent opportunities open for bidding right now.
Omaha Metropolitan Entertainment and Convention Authority
Special DistrictNE
Jul 14, 2026
Closes
Aug 5, 2026
Chilled water valve replacement.
CityFL
Jun 18, 2026
Closes
Aug 12, 2026
Work includes approx 15,000 LF of erosion control/silt fence; 230 LF of 8" C900 PVC pipe; 8 EA water service connection; 15,000 SY restoration - bahia sod; 5,640 LF of 14" PE 4710 directional bore.
CityGA
Jun 29, 2026
Closes
Jul 30, 2026
Provide construction manager at risk (cmar) services for brittany drive wtp improvements.
CityIN
Jul 24, 2026
Closes
Aug 24, 2026
The Town of Sellersburg, Indiana is soliciting sealed bids for the construction of the Sunflower Valley Water Distribution System Replacement project (PRIME AE Project No. 22113), with bids due by 2:00 PM EST on August 24, 2026. The work includes complete replacement of the existing Sunflower Valley water distribution system infrastructure, comprising water mains, 33 meters and service lines, 12 hydrants, and 39 valves, with connections to the existing Town of Sellersburg water distribution system and uninterrupted service to existing customers during construction. A mandatory pre-bid conference is scheduled for August 11, 2026 at 2:00 PM EST at Sellersburg Town Hall, and bidding documents are available for purchase via www.lynnimaging.com with an expected project duration of 165 days.