Summary
The Town of Sellersburg, Indiana is soliciting sealed bids for the construction of the Sunflower Valley Water Distribution System Replacement project (PRIME AE Project No. 22113), with bids due by 2:00 PM EST on August 24, 2026. The work includes complete replacement of the existing Sunflower Valley water distribution system infrastructure, comprising water mains, 33 meters and service lines, 12 hydrants, and 39 valves, with connections to the existing Town of Sellersburg water distribution system and uninterrupted service to existing customers during construction. A mandatory pre-bid conference is scheduled for August 11, 2026 at 2:00 PM EST at Sellersburg Town Hall, and bidding documents are available for purchase via www.lynnimaging.com with an expected project duration of 165 days.