Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of street improvements including median installation and landscape/irrigation improvements, curb and gutter, curb ramps, paving, striping, and all related work. 1 LS mobilization; 1 LS NPDES/water pollution control plan, SWPPP; 1 LS traffic control plan; 1 LS construction survey & staking; 1 LS clearing & grubbing and misc removals; 2,700 CY unclassified excavation; 2,500 LF construct a2-6 curb and gutter per SPPWC std. 120-3; 1,300 LF construct a1-8 curb and gutter per SPPWC std. 120-3; 3,700 LF construct concrete bikeway separator; 180 LF construct modified retaining curb per detail; 14,000 SF remove & construct 4" sidewalk per SPPWC std. 113-2; 16,000 SF construct 4" sidewalk per SPPWC std. 113-2; 200 SF construct PCC driveway per SPPWC std. 110-2. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 17, 2026
Release: Dec 18, 2025
Close: Feb 17, 2026
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
AvailableProcuring a contractor to provide construction services for the Avenida Vista Grande Bridge Reconstruction Project, involving the repair and rehabilitation of an existing concrete box culvert bridge.
Posted Date
Jan 18, 2026
Due Date
Feb 19, 2026
Release: Jan 18, 2026
Close: Feb 19, 2026
Procuring a contractor to provide construction services for the Avenida Vista Grande Bridge Reconstruction Project, involving the repair and rehabilitation of an existing concrete box culvert bridge.
AvailableRockwood School District is soliciting bids to enclose the third‑floor corridor balcony at Marquette High School. The opportunity was posted on January 16, 2026 and seeks proposals via the district’s Bonfire portal. Bids are due January 27, 2026 at 10:00 AM CST, and the posting notes a mandatory pre‑bid meeting at the district’s Facilities Warehouse.
Posted Date
Jan 16, 2026
Due Date
Jan 27, 2026
Release: Jan 16, 2026
Close: Jan 27, 2026
Rockwood School District is soliciting bids to enclose the third‑floor corridor balcony at Marquette High School. The opportunity was posted on January 16, 2026 and seeks proposals via the district’s Bonfire portal. Bids are due January 27, 2026 at 10:00 AM CST, and the posting notes a mandatory pre‑bid meeting at the district’s Facilities Warehouse.
AvailableThe County of San Luis Obispo is seeking services to identify and evaluate nature-based alternatives to provide 50-year and 100-year flood protection for the community around Arroyo Grande Creek in Oceano, CA. The scope includes project management, stakeholder engagement, data collection, hydrologic and hydraulic modeling, alternatives analysis, preliminary design, environmental review, and grant application preparation. The solicitation estimates a contract value in the $500,000–$2,000,000 range and has a response deadline of February 23, 2026.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
The County of San Luis Obispo is seeking services to identify and evaluate nature-based alternatives to provide 50-year and 100-year flood protection for the community around Arroyo Grande Creek in Oceano, CA. The scope includes project management, stakeholder engagement, data collection, hydrologic and hydraulic modeling, alternatives analysis, preliminary design, environmental review, and grant application preparation. The solicitation estimates a contract value in the $500,000–$2,000,000 range and has a response deadline of February 23, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis