Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rockwood School District is soliciting bids to enclose the third‑floor corridor balcony at Marquette High School. The opportunity was posted on January 16, 2026 and seeks proposals via the district’s Bonfire portal. Bids are due January 27, 2026 at 10:00 AM CST, and the posting notes a mandatory pre‑bid meeting at the district’s Facilities Warehouse.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
Posted Date
Dec 18, 2025
Due Date
Feb 17, 2026
Release: Dec 18, 2025
Close: Feb 17, 2026
Create a multifunctional corridor. Construction of an approximately half-mile long multi-functional corridor parallel to and crossing laguna creek. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across laguna creek. Additional project features include construction of two floodway excavation areas to offset the floodplain encroachments from the elevated multi-functional corridor. See outside link.
AvailableWork includes modifications to portions of the first floor to create an improved public access route to the restaurant tenant space, reconfigure restroom areas, and update supporting building systems, including associated architectural, structural, mechanical, electrical, plumbing, and fire protection work.
Posted Date
Jan 15, 2026
Due Date
Jan 27, 2026
Release: Jan 15, 2026
Close: Jan 27, 2026
Work includes modifications to portions of the first floor to create an improved public access route to the restaurant tenant space, reconfigure restroom areas, and update supporting building systems, including associated architectural, structural, mechanical, electrical, plumbing, and fire protection work.
AvailableProvide third levee lift project.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Provide third levee lift project.
AvailableThe Housing Authority of the City of Brownsville (HACB) issued IFB 25-004: Floor Renovation Project for Tropical Gardens Apartments (58 occupied public housing units) to provide complete, code-compliant flooring removal and installation while minimizing resident disruption. Scope includes removal and disposal of existing flooring and trim, subfloor preparation, application of underlayment and installation of Shaw resilient flooring and transition strips, and reinstallation or replacement of baseboards. Period of performance is 90 calendar days from commencement and bidders must provide a project schedule, cost breakdown, bid bond, and required certifications.
Posted Date
Jan 2, 2026
Due Date
Feb 12, 2026
Release: Jan 2, 2026
Close: Feb 12, 2026
The Housing Authority of the City of Brownsville (HACB) issued IFB 25-004: Floor Renovation Project for Tropical Gardens Apartments (58 occupied public housing units) to provide complete, code-compliant flooring removal and installation while minimizing resident disruption. Scope includes removal and disposal of existing flooring and trim, subfloor preparation, application of underlayment and installation of Shaw resilient flooring and transition strips, and reinstallation or replacement of baseboards. Period of performance is 90 calendar days from commencement and bidders must provide a project schedule, cost breakdown, bid bond, and required certifications.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis