CityIL
Aug 6, 2026
Closes
Sep 8, 2026
16th Street Waterline Improvements
Construct approx. 4,125 LF of 6" yelomine, and 100 LF of 1.25" copper, water main replacements,
Description: Waterline replacement includes replacement of 5,030 LF of water main. The replacement of the main includes the replacement of the related Appurtenances and service connection (Base Bid). Additionally, the project includes an alternate bid for replacing approx. 11,65 LF of water main along "Alley A' between 7th Street South and 4th Street South. Replacement of the main includes the replacement of the related appurtenances and service connection (Bid Alternate A).
City · ID, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Nampa.
These related opportunities are still open for bidding.
CityIL
Aug 6, 2026
Closes
Sep 8, 2026
Construct approx. 4,125 LF of 6" yelomine, and 100 LF of 1.25" copper, water main replacements,
CityOR
Aug 18, 2026
Closes
Sep 8, 2026
Work consists of installing approx 3,400 LF of new water main-comprising 2,700 feet of 8", 500 feet of 6", and 200 feet of 4" pipe-along with associated hydrant and service line replacements.
South Carolina Department of Transportation
State AgencySC
Aug 3, 2026
Closes
Sep 9, 2026
Work includes 20 LF installation of monitoring wells; 990 ton removal & disposal of contaminated soil; 1,080 gal removal & disposal of contaminated liquids; 315 SY removal & disposal of existing pavement; 1 LS removal & disposal of existing bridge; 664 CY unclassified excavation; 2,987 SY fine grading; 492 SY milling existing asphalt pavement (variable); 784 TON asphalt base course - type b; ; 313 ton asphalt intermediate course type c. See attached file.
South Carolina Department of Transportation
State AgencySC
-
Closes
Sep 9, 2026
Work includes approx 4,989 CY borrow excavation; 492 SY milling existing asphalt pavement; 5,580 LF 4" yellow solid lines pavement marking (temporary-paint); 1,050 LF 2" schedule 80 PVC conduit; 173,649 LB reinf. steel for structures (bridge).