Open RFP

1670 Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements RFP

Description: Work includes improvements of dewatering pump station; repair of the ECT-1 isolation gate; new flushing connection to the 6-inch drain line from the suction header; replacement of five (5) suction line pressure indicators (gauges) with pressure transmitters and the addition of seven (7) discharge line pressure transmitters; removal of the approximately two hundred and sixty (260) linear feet of existing cavern drip ceiling gutter, replacement with new gutter and collection system, and the addition of eight (8) gutter downspouts; new cavern drip ceiling access platform, grating, handrail, and jib crane; approx. Two hundred ninety two (292) linear feet of joint repairs at the precast stairwells and elevator shaft.

Buyer
Released
Nov 24, 2026
Closes
Jan 20, 2027(54 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts