EASTERLY TUNNEL DEWATERING AND DIVISION AVENUE PUMP STATION IMPROVEMENTS RFP
Description: The Easterly Tunnel Dewatering and Division Avenue Pump Stations Improvements project is a collection of approved CIP project nominations and investigation recommendations combined for their similarities across engineering and construction disciplines.
The Easterly Tunnel Dewatering Pump Station (ETDPS) was commissioned in 2018 and provides 160 MGD pumping capacity for three deep storage tunnel systems in the Easterly service area. Operations and Maintenance activities over the last seven years have identified several areas of improvements to process mechanical, architectural, and life safety components within the pump station.
The Division Avenue Pump Station (DAPS), originally constructed in 1951, provides a total pumping capacity of 8 MGD to the Westerly Low Level Interceptor and local combined sewer area near Westerly Wastewater Treatment Center. Over the last few years, District staff have identified on-going excessive pump impeller wear that has resulted in the recommendation for pump replacement. This project will replace the pumps and provide ancillary upgrades to maintain reliable service.
The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams.
In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion.
NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual. We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Work includes improvements of dewatering pump station; repair of the ECT-1 isolation gate; new flushing connection to the 6-inch drain line from the suction header; replacement of five (5) suction line pressure indicators (gauges) with pressure transmitters and the addition of seven (7) discharge line pressure transmitters; removal of the approximately two hundred and sixty (260) linear feet of existing cavern drip ceiling gutter, replacement with new gutter and collection system, and the addition of eight (8) gutter downspouts; new cavern drip ceiling access platform, grating, handrail, and jib crane; approx. Two hundred ninety two (292) linear feet of joint repairs at the precast stairwells and elevator shaft.
Key Contacts on this RFP
Decision makers connected to this RFP from Northeast Ohio Regional Sewer District.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
600 days before RFP
The NEORSD Board adopted authorization to issue an RFP for design and construction-administration services for the Easterly Tunnel Dewatering and Division Avenue Pump Stations Improvements project.
See sourceHide source
Action Items Authorization to Issue Request for Proposal (RFP) Resolution No. 68-25 Resolution No. 69-25 Authorization to issue an RFP for design and construction administration/resident project representation services for the Easterly Tunnel Dewatering and Division Avenue Pump Stations Improvements project. Authorization to issue an RFP for design and…
NEORSD staff reported premature Division Avenue Pump Station impeller and wear-plate deterioration and planned pump replacement for the following year.
See sourceHide source
are some issues at the Division Avenue Pump Station with impellers and wear plates wearing prematurely. The-pumps at this facility are planned for replacement next year. Mr. Foley provided
Northeast Ohio Regional Sewer District Board of Trustees Meeting
The NEORSD Board adopted authorization to enter into a not-to-exceed $1,162,407.96 Stantec agreement for design and construction-administration services for the Easterly Tunnel Dewatering and Division Avenue Pump Stations Improvements project.
See sourceHide source
Authorization to Enter Into Agreement Resolution No. 208-25 Resolution No. 209-25 Resolution No. 210-25 Resolution No. 211-25 Authorization to enter into a professional services agreement with Stantec Consulting Services, Inc. for design and construction administration/resident project representation services for the Easterly Tunnel Dewatering and Division…
Budget
The FY2026 capital plan lists Project 1670 for Easterly Tunnel Dewatering and Division Avenue Pump Stations Improvements with a $4,303,408 budget total and scheduled spending through 2030.