Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work to be performed includes the furnishing and installing of approximately 600’ of 8” gravity sewer main, manholes (5), connections to existing gravity sewer and service, demolition and disposal of an existing package plant, and associated work, and shall include all labor, supervision, materials, equipment, and incidentals which may be required for the construction and completion of the proposed work. All work will be completed within 60 calendar days from the issuance of Notice to Proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Dresurfacing east grafton rd east grafton rd.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Dresurfacing east grafton rd east grafton rd.
AvailableSeeking professional engineering services for an alignment study and for final design services for a roadway project. Consultant shall conduct an alignment study for the widening of road. Develop conceptual design alignments, evaluate the alternative alignments to identify and recommend a preferred alignment considering costs and the traffic, physical, cultural, and environmental features of the project corridor, and prepare preliminary (15%) line & grade plans. Develop a corridor alignment report presenting the alternatives considered. The county's corridor alignment report review checklist is also included as exhibit b, to serve as a guide for the consultant. During negotiations, the county shall provide specific guidance as to the information that will be required in the corridor report and project deliverables. See outside link.
Posted Date
Dec 5, 2025
Due Date
Jan 21, 2026
Release: Dec 5, 2025
Close: Jan 21, 2026
Seeking professional engineering services for an alignment study and for final design services for a roadway project. Consultant shall conduct an alignment study for the widening of road. Develop conceptual design alignments, evaluate the alternative alignments to identify and recommend a preferred alignment considering costs and the traffic, physical, cultural, and environmental features of the project corridor, and prepare preliminary (15%) line & grade plans. Develop a corridor alignment report presenting the alternatives considered. The county's corridor alignment report review checklist is also included as exhibit b, to serve as a guide for the consultant. During negotiations, the county shall provide specific guidance as to the information that will be required in the corridor report and project deliverables. See outside link.
Provide professional services (ps) to engage a department of transportation pre-qualified consulting engineering firm (hereinafter referred to as the consultant) must provide pre-qualification for 2. 0 project development environmental studies, to provide professional project development & environment (pd&e) services for: the extension of road.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Provide professional services (ps) to engage a department of transportation pre-qualified consulting engineering firm (hereinafter referred to as the consultant) must provide pre-qualification for 2. 0 project development environmental studies, to provide professional project development & environment (pd&e) services for: the extension of road.
AvailableSeneca avenue reconstruction (norton st to east ridge rd).
Posted Date
Nov 17, 2025
Due Date
Dec 30, 2025
Release: Nov 17, 2025
Close: Dec 30, 2025
Seneca avenue reconstruction (norton st to east ridge rd).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis