Chicago Department of Aviation Police
Police DepartmentIL
Posted
Sep 2, 2026
Nov 17, 2026
1335301: RSIP Odor Mitigation Phase 2 RFP
Residential sound insulation program odor mitigation phase 2.
Description: Specification Number: 1335301 Title: 1335301: RSIP Odor Mitigation Phase 2 Required for use by: CHICAGO DEPARTMENT OF AVIATION Project Overview / General Description of the Work: The Work consists of furnishing all means, methods, labor, materials, tools, equipment, transportation, and services for performing the Sound Insulation Work as shown on the Construction Modifications and as described in the Technical Specifications, including all appurtenant Work and accessories, to the complete satisfaction of, approval and acceptance by the City. This includes, but is not limited to, alterations and modifications of approximately 242 dwelling units in the area surrounding Chicago O'Hare International Airport ("O'Hare"), and Chicago Midway International Airport ("Midway"), consisting of single-family and multi-family Residences ("Homes") in various communities. Homes are single-family or multi-family structures that include apartments and condominiums, and vary in construction type, external materials, and style. The residential construction documents ("Construction Modifications") for the Work on the Homes will be provided to Contractor(s) with the Notice to Proceed ("NTP"). This description of Work is intended to be general in nature and is neither a complete description nor a limitation on the Work to be performed. Contractor must perform all Work described in the Contract Documents or reasonably inferable as necessary to produce the results specified therein, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. Estimated Project Cost: $17,750,000 - $18,250,000 CDA Project Numbers: H8090.23-02 and M8124.23-02 Advertisement Date: September 3, 2026 Pre-Bid Conference Date/Time: September 16, 2026 at 10:00 AM CDT (Aviation Administration Building, 10510 West Zemke Road, Chicago IL 60666) Question Cut-Off Date/Time: September 22, 2026 at 4:00 PM CDT Key solicitation parameters included in the Contract Documents: Bid deposit: 2% of Total Base Bid; Performance and Payment Bond: $2,200,000.00 or 10% of Contract Value, whichever is greater; Contract specific goals: 15% MBE, 5% WBE, 3% VBE. Type of funding: BOND. Project includes detailed Schedule of Prices with Group A and Group B line items and allowances for permit fees, asbestos removal, unforeseen conditions, security system disconnect/reconnect, mobilization (not to exceed 3% of Group A Base Bid), and project closeout documentation. Attachments referenced in the bid package: Part One (Instructions and Execution Documents), Part Two (General Conditions), Part Three (Technical Specifications), and multiple addenda including bid due date extension addenda and a scope update. Additional administrative notes: This solicitation is restricted to invited suppliers. Bidders must complete required affidavits, M/WBE/VBE compliance documents, Economic Disclosure Statement (EDS) online, and other required submittals listed in the Document Submittal Checklist. Contract durations and liquidated damages provisions are specified in Part One and Part Two. This Project is managed by the Chicago Department of Aviation and is issued by the Department of Procurement Services.
City · IL, US
Decision makers connected to this RFP from City of Chicago.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Chicago Department of Aviation Police
Police DepartmentIL
Posted
Sep 2, 2026
Nov 17, 2026
Residential sound insulation program odor mitigation phase 2.
CityFL
Posted
Oct 11, 2026
Nov 19, 2026
This project involves shoreline, seawall, landscape and grading improvements to the Hollywood Lakes community, as well as seawall, berm, roadway and sidewalk improvements at Holland Park. The work includes shoreline protection, seawall construction, flood mitigation improvements, grading, drainage enhancements, sidewalk improvements, landscaping, and associated site restoration. The project aim is to enhance the tidal flooding and shoreline resiliency of the aforementioned areas to improve the safety, accessibility and functionality of the area. The scope involves testing & inspections, sheet piling, sitework, landscaping & wetland plantings.
Stillwater Medical Center Authority
Special DistrictOK
Posted
Nov 5, 2026
Nov 19, 2026
Parking Lot #2 - Phase 2.
U.S. Army Engineer District ST Louis
FederalMO
Posted
Jun 23, 2026
Jun 23, 2027
The U.S. Army Corps of Engineers, St. Louis District issued a presolicitation (W912P926BA008) to provide federal construction assistance to the Metropolitan St. Louis Sewer District (MSD) for sewer rehabilitation using Cured-In-Place Pipe (CIPP) methods. The initial work covers approximately 2,675 linear feet of 21- to 24-inch sewers within MSD Service Area 1, performed at various sites across the MSD service area in St. Louis City and St. Louis County, MO. This notice is a procurement presolicitation (not a grant) and is active on SAM.gov; solicitation documents will be made available through the PIEE solicitation module.