90 inch Watermain Relocations at I-190-General Trades RFP
Aug 3, 2026
Closes
Aug 19, 2026
Relocation of existing water mains on the east side of the airport. A new 90" water main, a temporary 60" bypass main, and a new 48" main will be installed, with ancillary water and storm water piping. Work requires temporary earth retention, jack-and-bore, concrete thrust blocks, and hot tap work, as well as supporting demolition, paving, utility, pavement, fencing, and electrical work.