CityUT
Aug 13, 2026
Closes
Sep 1, 2026
Spitfire Storm Drain Improvement Project
Work includes approx 25 LF 24" HDPE storm drain pipe; 1 EA 12" gate valve assembly with collar; 30 LF 30" type A curb and gutter with base; 1 LS landscape; 809 SF bituminous pavement T-patch.