CityIN
Posted
Oct 29, 2026
Nov 12, 2026
0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St RFP
Reconstructed by removing the existing chip and seal pavement, sidewalk, and storm infrastructure and replacing them with new concrete pavement, subsurface drainage, and 6' curb face sidewalks.
