Closing soon

0768R - Pufferbelly Pedestrian Bridge over Coliseum Blvd/SR 930

Description: Improve the pedestrian bridge, an elevated bridge that will be constructed. The bridge will carry pedestrian traffic over the roadway. Work includes 3146 LF of 42" cured-in-place pipe liner; 1 EA of 6" large water service replacement; Construction of the bridge substructure and superstructure includes cast-in-place concrete footings, epoxy-coated reinforcing steel, structural steel, elastomeric bearings, a reinforced concrete moment slab, steel and concrete railings, surface sealing, a cable mesh safety barrier, and custom architectural features like face-lit LED signage, a curved steel arch/base, and stainless steel accents. Additional infrastructure upgrades include extensive storm drainage installation (inlets, precast round inlets, Cured-In-Place Pipe lining), water main connections and utility work (16" and 6" HDPE pressure piping, valves, hydrants, blow-offs), electrical and lighting systems (HDPE conduit, fiber optic cables, concrete lighting foundations, light poles, fixtures, wiring), asphalt paving, concrete sidewalks, chain-link fencing, temporary traffic control/barrier installation, and final landscaping with mulched seeding.

Buyer
City of Fort Wayne

City · IN, US

Released
Aug 6, 2026
Closes
Aug 27, 2026(2 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts