Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction area signs; portable lighting systems; street sweeping; 135,000 CY roadway excavation; 4,050 ton shoulder backing; move-in/move-out (erosion control); 1,740,000 SF hydromulch; 44,000 CY class 2 aggregate base (cy).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The California Department of Transportation is soliciting bids for highway construction work including joint plain concrete pavement (JPCP), hot mix asphalt (HMA), aggregate base, earthwork, and bridge work near Lemoore in Kings and Fresno counties. The project has an estimated value of approximately $72,000,000 and a contract duration of 585 working days. The bid package was published on December 8, 2025 and bids will be opened on January 29, 2026.
Posted Date
Dec 8, 2025
Due Date
Jan 29, 2026
Release: Dec 8, 2025
Close: Jan 29, 2026
The California Department of Transportation is soliciting bids for highway construction work including joint plain concrete pavement (JPCP), hot mix asphalt (HMA), aggregate base, earthwork, and bridge work near Lemoore in Kings and Fresno counties. The project has an estimated value of approximately $72,000,000 and a contract duration of 585 working days. The bid package was published on December 8, 2025 and bids will be opened on January 29, 2026.
Premium
Access the largest public sector contact database
Hma, rhma, jpcp, jpcp(rsc), and individual slab replacement (rsc).
Posted Date
Oct 27, 2025
Due Date
Dec 18, 2025
Release: Oct 27, 2025
Close: Dec 18, 2025
Hma, rhma, jpcp, jpcp(rsc), and individual slab replacement (rsc).
AvailableTemporary flashing signal panel systems, remove telephone and fiber optic facility, jointed plain concrete pavement (colored), stress reducing slab, 24" rubber gasketed reinforced concrete pipe, air-vent, concrete (channel lining) (fresno irrigation district), standpipe (fresno irrigation district), outlet stand (fresno irrigation district), backup structure (fresno irrigation district), rock slope protection (fresno irrigation district), rock slope protection fabric, 36" rubber gasketed reinforced concrete pipe,
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Temporary flashing signal panel systems, remove telephone and fiber optic facility, jointed plain concrete pavement (colored), stress reducing slab, 24" rubber gasketed reinforced concrete pipe, air-vent, concrete (channel lining) (fresno irrigation district), standpipe (fresno irrigation district), outlet stand (fresno irrigation district), backup structure (fresno irrigation district), rock slope protection (fresno irrigation district), rock slope protection fabric, 36" rubber gasketed reinforced concrete pipe,
AvailableSaline County is soliciting competitive bids for 2026 hot-mix asphalt pavement work, milling, and aggregate shoulder construction. The project scope includes HMA pavement placement, milling operations, and aggregate shouldering per the bid specifications; completion is expected in 2026. Bids are due December 30, 2025, with an 11:00 AM Central bid opening; the solicitation is an Invitation for Bid and not a grant.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Saline County is soliciting competitive bids for 2026 hot-mix asphalt pavement work, milling, and aggregate shoulder construction. The project scope includes HMA pavement placement, milling operations, and aggregate shouldering per the bid specifications; completion is expected in 2026. Bids are due December 30, 2025, with an 11:00 AM Central bid opening; the solicitation is an Invitation for Bid and not a grant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis