CityAR
-
Closes
Aug 13, 2026
2026 Street Rehab
Work includes 1580 SY of perform 2" milling of existing asphalt surface. Includes milling, shaping, removal and disposal of excavated material as needed; 650 SY of perform 6" removal of existing asphalt surface includes pulverizing, shaping, removal and disposal of excavated material as needed; 210 SY of perform removal and replacement of existing concrete pavement/driveway to neat lines including removal and disposal.