CityCT
Jul 31, 2026
Closes
Aug 26, 2026
Esther Ave. & Crown Street Drainage Improvements
Work includes 10 LF sedimentation control system; 50 CY rock in drainage trench excavation; 30 SY pavement restoration-local road; 470 LF (12") dia HDPE corrugated pipe; 70 LF (6") dia HDPE corrugated pipe; 300 LF (4") dia PVCC perforated pipe; 15 LF bituminous concrete curbing; 80 SF portland cement concrete (pcc) sidewalk 5"; 80 LF topsoil and turf establishment; 20 LF replacement/relocate sanitary sewer lateral; 40 LF 1" k copper tubing; 2 EA 1" corporation stop valve; 2 ea 1" curb stop valve. See outside link.