Wisconsin Department of Administration
State AgencyWI
Posted
Sep 8, 2026
Oct 28, 2026
01 - GPC - Dam and Dike Repairs and Renovations
In general, the work consists of: the removal of an earthen dam at Wildlife Area; and earthwork, maintenance, and repairs of earthen berms, removal of two water control structures, and the replacement of two culvert pipes, at the Wildlife Area. Earthwork at Princes Point includes excavation and repair of muskrat holes, filling low spots, and lowering of a 200 ft portion of the north berm.