Southeast 102nd Avenue and Woodstock Boulevard LID RFP
Perform highway and road paving service, highway, and road resurfacing, elevated roadway or highway, interstate highway or freeway or turnpike.
Description: Pavement rehabilitation, pavement patching, trail repair, a pedestrian hybrid beacon, storm intakes and storm sewer, and curb ramps.
City · IA, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
729 days before RFP
The City Council agenda proposed additional design services for reconstruction, trail, utility, signal, and ADA-ramp work extending to 66th Avenue.
Resolution authorizing execution of Amendment No. 1 to the Professional Services Agreement with Snyder and Associates, Inc. specifying an increased amount not to exceed $106,500 for engineering design services in connection with the Kirkwood Boulevard SW from Kirkwood Court to Rolling Ridge Drive Rehabilitation project (original contract amount was…
Notice of City Council Meeting
Board meeting · Oct 22, 2024
Budget
477 days before RFP
The FY 2026 adopted capital-project detail lists a $2,000,000 expense budget for Kirkwood Boulevard SW work including reconstruction to 66th Avenue and concrete repair to Rolling Ridge Drive.
Capital Improvement Project Detail The capital improvement project detail includes the projects that are included in the adopted budget. Expenditures include costs such as design, property acquisition and construction.…
Board meeting
85 days before RFP
Cedar Rapids City Council approved Amendment No. 5 to Snyder & Associates' professional services agreement for up to $46,820 for the Kirkwood Boulevard SW rehabilitation project.
0938-07-26 q. Amendment No. 5 to the Professional Services Agreement with Snyder & Associates, Inc. for an amount not to exceed $46,820 for the Kirkwood Boulevard SW from Kirkwood Court to Rolling Ridge Drive Rehabilitation project (original contract amount was $268,500; total contract amount with this amendment is $726,450). (Paving for Progress) Council…
City Of Cedar Rapids City Council Regular Session Meeting Minutes
Board meeting · Jul 28, 2026
Agenda packet
1 day before RFP
Public Works proposed filing plans and advertising bids for the $1,380,000 Kirkwood Boulevard SW rehabilitation project, with construction planned for 2027 and 2028.
Description of Agenda Item: Motions filing plans and specifications Motion setting public hearing date for November 3, 2026 and directing publication thereof, filing plans and/or specifications, form of contract and estimated cost, advertising for bids by posting notice to bidders as required by law, and authorizing City officials or designees to receive…
Cedar Rapids City Council Regular Meeting
Agenda packet · Oct 20, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (10 days left)
City of Cedar Rapids, Iowa FY2026 Budget
Budget · Jul 1, 2025
Background: The Kirkwood Boulevard project is planned for construction in 2027 and 2028. On July 28, 2026, City Council approved Amendment No. 5 to the Professional Services Agreement with Snyder & Associates, Inc. for additional traffic analysis, survey and acquisition services, and to split the project into two bid packages. This project is the first bid…
Cedar Rapids City Council Regular Meeting
Agenda packet · Oct 20, 2026
Decision makers connected to this RFP from City of Cedar Rapids.
Adjacent opportunities open for bidding right now.
CityOR
Posted
-
Oct 27, 2026
Perform highway and road paving service, highway, and road resurfacing, elevated roadway or highway, interstate highway or freeway or turnpike.
CityFL
Posted
-
Oct 27, 2026
Work includes construction of a new roadway section together with sidewalk, stormwater drainage system, and an underground water main installed along the west side of the improvements. The work further includes asphalt paving, roadway pavement striping, signage.
Special DistrictNY
Posted
Sep 8, 2026
Oct 28, 2026
Perform substructure and underdeck concrete repairs, bearing replacement, lead and asbestos abatement, cleaning, painting, and installation of anti-graffiti coating on the bridge.
CityCA
Posted
Sep 1, 2026
Nov 3, 2026
Work consist of 3,572 lf of sawcut pcc and ac, removal and installation of striping, markings and signage, earthwork, grading, off haul, relocation, or reinstall, 435 sf of concrete flatwork in pedestrian median islands, 19,053 sf of concrete flatwork, 2,403 lf of construct curb and gutter, 1,238 sf of concrete flatwork 8" inches thick (driveways or vehicle areas), 7 ea of led street light (single arm, includes pull boxes, poles, conduit, wires and installation), 2 ea of led street light (dual arm, includes pull boxes, poles, conduit, wires and installation). See attached file.