RFP Catalog/Fire Station Alerting System

Fire Station Alerting System RFPs

Browse active Fire Station Alerting System RFP opportunities from federal, state, and local government agencies. Find solicitations, track deadlines, and discover bid opportunities updated daily.

City of Minneapolis

The City of Minneapolis is requesting information to support planning, procurement, and installation of new fire station alerting systems for all 19 Minneapolis fire stations. This Request for Information (RFI) is strictly an inquiry to gather information; no contract will be awarded through this RFI. The solicitation was posted on 2026-06-08 and the response deadline is listed as 2026-07-24.

Posted Date

Jun 8, 2026

Due Date

Jul 24, 2026

Timeline Progress20%
Pacific Air Forces

The Department of the Air Force has a requirement to procure, deliver, and install a Fire Station Alerting and Alarm (FSAA) System. The contractor is responsible for providing all necessary equipment, materials, software, and labor to ensure a fully operational and integrated system. Detailed technical specifications and performance requirements are outlined in the associated Performance Work Statement.

Posted Date

May 21, 2026

Due Date

Jun 30, 2026

Timeline Progress68%
U.S. Air Force Academy

The United States Air Force Academy (USAFA) issued a Brand Name Sole Source solicitation (FA700026Q0048) to procure the Westnet First-In Fire Station Alerting System as a 100% Small Business set-aside. The acquisition includes Buy American requirements, NAICS 334290 and PSC 6350, with performance at USAF Academy, CO. Proposals are due June 18, 2026 at 4:00 p.m. EDT and the opportunity was posted May 22, 2026.

Posted Date

May 22, 2026

Due Date

Jun 18, 2026

Timeline Progress97%
City of Austin

This contract is to purchase audio parts, including amplifiers, speakers, mounting racks, brackets, and back-up power supplies, for Station alerting systems.

Posted Date

Jun 15, 2026

Due Date

Jul 14, 2026

Timeline Progress8%
Department of Commerce NOAA Regional Offices

The scope of this requirement includes removal of existing fire alarm and mass notification systems and installation of new combination Intelligent Addressable Fire Alarm (FA) and Mass Notification Systems (MNS).

Posted Date

Jun 2, 2026

Due Date

Jun 18, 2026

Timeline Progress96%
City of Phoenix

Provide 50 EA seating: recliner - refer to section 3, scope of work, 3. 4 seating specifications; 25 EA bed frame: twin standard - refer to section 3, scope of work, 3.5 bed frame specifications; 25 EA bed frame: twin xl - refer to section 3, scope of work, 3.5 bed frame specifications; 40 EA mattress: twin - refer to section 3, scope of work, 3. 6 mattress specifications; 40 EA mattress: twin xl - refer to section 3, scope of work, 3. 6 mattress specifications. See outside link.

Posted Date

Jun 3, 2026

Due Date

Jun 26, 2026

Timeline Progress62%
Manchester School District

Furnishing and installation of a standardized emergency communication system utilizing speaker/strobe notification appliances and buttons.

Posted Date

May 8, 2026

Due Date

Jun 25, 2026

Timeline Progress84%
City of El Cajon

Work includes, but is not limited to, expanding the fire station from 3,488 SF to 5,105 SF, increased building height, a double apparatus bay, dormitories, individual restrooms, turn-out locker room, laundry-extractor room, kitchen, lounge room, office space, and furniture, fixtures, and equipment.

Posted Date

May 14, 2026

Due Date

Jun 23, 2026

Timeline Progress86%
Nineveh Township Volunteer Fire Department

This project consists of the construction of a brand-new 9,448 SF fire station facility.

Posted Date

Jun 1, 2026

Due Date

Jun 23, 2026

Timeline Progress74%
City of Farmers Branch

Provide roof replacement. Approx. 5,500 SF of flat roof will be demoed and replaced. Adhere second layer of 2.2" insulation to bas layer. Adhere 1/2 coverboard prime. Adhere 60 mil tpo membrane. Flash all parapet walls and curbs. Fabricate and install parapet metal cap. See attached file.

Posted Date

-

Due Date

Jun 18, 2026

California Department of Forestry and Fire Protection

Project work consist of: constructing a new four-bedroom, two bay fire station, storage building, pump building, and vehicle wash building, along with associated site improvements including a ground-mounted photovoltaic system, water storage tanks, and a fuel vault with dispensing system.

Posted Date

May 13, 2026

Due Date

Aug 11, 2026

Timeline Progress39%
City of Chehalis

The City of Chehalis is seeking statements of qualifications from qualified engineers and architectural teams to provide professional services for the feasibility, renovation, and restoration of a historic fire station built in 1925 at 455 Park Street. The approximately 22,000 square foot facility is to be restored and updated for reoccupation as an active fire station while preserving its historic character. Submittals are limited to 15 pages, single-sided, with resumes allowed in an appendix that does not count toward the page limit.

Posted Date

May 29, 2026

Due Date

Jun 30, 2026

Timeline Progress60%
City of Vancouver

This Contract provides for the installation of lighting and lighting controls.

Posted Date

Jun 4, 2026

Due Date

Jun 23, 2026

Timeline Progress70%
City of Ottawa

Replacement of existing HVAC equipment.

Posted Date

May 29, 2026

Due Date

Jun 25, 2026

Timeline Progress72%
Town of Huntersville

Work includes grading, 1 EA tree removal, 23 SY remove & replace existing asphalt pavement, 34 SY remove & replace existing concrete pavement, 37 LF removal of 1'-6" concrete curb & gutter, 8 LF remove & replace 6" ribbon curb, 7 SY remove & replace 4" concrete sidewalk, 123 LF 4" pvc pipe, 1 EA adjustment of drop inlet rim. See attached file.

Posted Date

Jun 5, 2026

Due Date

Jun 25, 2026

Timeline Progress62%
Bigfork Fire District

Work consists of Construction of a new Fire Department Headquarters Facility of approximately 24,000 SF.

Posted Date

May 26, 2026

Due Date

Jun 22, 2026

Timeline Progress83%
City of Rancho Cucamonga

Scope of work to be performed consists of, but not limited to, the renovation/ remodel of the fire fighter restroom facilities. The restroom renovation layout has been developed to satisfy the operational needs (privacy, gender neutral, accessibility) of the district. The interior renovations are taking place at the location of the existing restroom/shared facilities. They will provide the fire station with individual/singleuse private facilities. In addition, at fire station no. 174, the flooring in the kitchen and connected hallway will be replaced with a durable epoxy terrazzo finish for improved longevity and ease of maintenance. In addition, at fire station no. 175, there will be roof mechanical systems and roof repairs work.

Posted Date

Jun 2, 2026

Due Date

Jul 21, 2026

Timeline Progress31%
City of Sugar Land

Request for qualifications for fire station expansion and rebuild work.

Posted Date

-

Due Date

Jun 25, 2026

Town of Westwood

This is a Request for Quotation (RFQ) for Fire Station 1 Operations & Maintenance (OPM) for the Town of Westwood, MA. The solicitation includes equipment, supplies, maintenance services, and programmatic documentation, with two addenda already posted. The RFQ opened on March 18, 2026, and remains active as the close date is currently listed as TBD.

Posted Date

Mar 18, 2026

Due Date

Dec 31, 2026

Timeline Progress32%
Village of Oxford

Renovations At the Village Fire Station.

Posted Date

May 20, 2026

Due Date

Jun 30, 2026

Timeline Progress69%

Win More Fire Station Alerting System RFPs

Get AI-powered buying signals and real-time alerts for fire station alerting system opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available