PW 2022 Bond Year 3 Contract 13
The major work will consist of the (approx.) following: 4,000 LF - 8" water pipe; 5,500 LF - 8" sewer pipe; 9,000 SY - pulverization and asphalt overlay; 20,800 SY - concrete pavement; 30,000 SF - concrete sidewalk; 33,000 SF - concrete driveway.