CityIN
Posted
Oct 22, 2026
Nov 5, 2026
0792D - Alley N-S: Lenox Ave, W Fairfax Ave, Buell Dr, Fairfield Ave
Work includes improvement of a concrete alley.
Browse RFPs from City of Fort Wayne with upcoming deadlines.
14 opportunities shown.
CityIN
Posted
Oct 22, 2026
Nov 5, 2026
Work includes improvement of a concrete alley.
CityIN
Posted
Oct 29, 2026
Nov 19, 2026
Sewer rehabilitation of two sets of large-diameter sewer infrastructure.
CityIN
Posted
Oct 29, 2026
Nov 12, 2026
Concrete sidewalk and street repairs, a new park near the Five Points roundabout, and a mini traffic circle in Fort Wayne, Indiana.
CityIN
Posted
Oct 29, 2026
Nov 30, 2026
Project includes oil, fleet department, bulk oil, drums and grease tubes, quarts.
CityIN
Posted
Oct 23, 2026
Nov 24, 2026
Work includes, but is not limited to, the interior demolition and removal of existing carpeting, paver flooring, wall finishes, ceiling finishes, and electrical components.
CityIN
Posted
Oct 19, 2026
Nov 19, 2026
Cybersecurity, water & wastewater industrial control system, asset inventory, threat detection, asset visibility.
CityIN
Posted
Oct 23, 2026
Nov 10, 2026
#2 Ultra Low Diesel fuel for 2027 for city fleet.
CityIN
Posted
Oct 15, 2026
Nov 5, 2026
Work include CIPP lining of approx 43,000 LF of small and medium diameter (8" to 36") sewers throughout the city.
CityIN
Posted
Oct 29, 2026
Nov 12, 2026
Reconstructing concrete street, milling asphalt, laying new asphalt surface, adding new sidewalk, curb, approaches, streetlights, storm drainage, pavement markings, and restoration.
CityIN
Posted
Oct 7, 2026
Nov 6, 2026
This RFP seeks professional-services proposals to facilitate redevelopment of the North River Site.
CityIN
Posted
Oct 22, 2026
Nov 18, 2026
Temporary Employment Services, Temp agency.
CityIN
Posted
Oct 14, 2026
Nov 10, 2026
Provide 2 EA low-voltage transformer; 4 EA panel boards; 2 EA motor control center; 2 EA surge protection device.
CityIN
Posted
Oct 29, 2026
Nov 12, 2026
Reconstructed by removing the existing chip and seal pavement, sidewalk, and storm infrastructure and replacing them with new concrete pavement, subsurface drainage, and 6' curb face sidewalks.
CityIN
Posted
Oct 29, 2026
Nov 12, 2026
We will be adding new sidewalks and a boardwalk over the Bullerman Drain on the south side of St Joe Center Road from Lahmeyer Road to North Arlington Pkwy.