RFP Catalog/Advanced Metering Infrastructure

Advanced Metering Infrastructure RFPs

Browse active Advanced Metering Infrastructure RFP opportunities from federal, state, and local government agencies. Find solicitations, track deadlines, and discover bid opportunities updated daily.

Parish of Pointe Coupee

The Parish of Pointe Coupee is seeking proposals for the implementation of an Advanced Metering Infrastructure (AMI) project under RFP 26-002. The scope of work includes providing all necessary services and deliverables required to establish the new metering system for the parish. Interested contractors must submit their firm proposals by the mid-June 2026 deadline to be considered for the contract.

Posted Date

Apr 16, 2026

Due Date

Jun 15, 2026

Timeline Progress76%
Town of Nahant

Contractor is to remove existing cold-water meters and existing meter interface units (MIU), and install new cold-water meters and MIUS, and provide integration with the AMI system. Cold water meters and MIU modules, and AMI system will be supplied by the owner.

Posted Date

May 20, 2026

Due Date

Jun 3, 2026

Timeline Progress84%
Irvine Ranch Water District

Advanced metering infrastructure implementation and meter replacement.

Posted Date

Apr 7, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
City of Rohnert Park

Project generally includes removal and replacement of existing water meters of various sizes, installation of advanced metering infrastructure (ami) communication components, replacement of meter box lids and related appurtenances, integration with the city's meter data management systems, testing and commissioning of ami equipment, customer service coordination, restoration of disturbed surfaces, and all associated work necessary to provide a complete and operational ami-enabled water metering system.

Posted Date

May 21, 2026

Due Date

Jun 25, 2026

Timeline Progress31%
Wagoner County Rural Water District 1

AMI metering infrastructure for the entire District.

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
Town of Batesburg-Leesville

The Town of Batesburg-Leesville seeks a turn-key, performance-based service to implement Automated Metering Infrastructure and related utility infrastructure improvements. The project involves installing a new metering system and providing related services to improve the town's utility operations and realize utility savings.

Posted Date

Sep 8, 2025

Due Date

Sep 29, 2026

Timeline Progress69%
City of Biggs

Deliver a fully operational AMI system for both electric and water utilities.

Posted Date

May 23, 2026

Due Date

Jul 1, 2026

Timeline Progress22%
City of Union Gap

Supply approx. 2,145 meter interface units, replace registers, complete positive displacement and ultrasonic meters, install accessories, technical support (three years), supply required meter data collection equipment, hardware, and software for complete advanced metering infrastructure (AMI) system.

Posted Date

May 13, 2026

Due Date

Jun 4, 2026

Timeline Progress85%
DLA Aviation

Nomenclature/Noun: Pump, Fuel, Metering NSN: 2915-00-438-5854RK PN: 365000-4 NSN: 2915-01-454-4612RK PN: 9C125-3 NSN: 2915-01-454-4612RK: 2 Mar 2023, 4 each, Parker Hannifin Corporation (CAGE 59211) Description/Function: The fuel pump contains a check valve to prevent reverse flow through the pump. End Item is the F-16 aircraft. Length 9.95”, Width 5.03”, Height 3.25”, Weight 4.90 lbs. Total Line-Item Quantity: L/I 0001, Pump Fuel Metering Production, 29 Each (Range: 7-44) L/I 0002, Surge Capability Plan, 1 LOT Application (Engine or Aircraft): F-16.

Posted Date

May 22, 2026

Due Date

Jul 8, 2026

Timeline Progress21%
DLA Aviation

NSN: 2915-01-041-8639 RK, Pump, Fuel, Metering. Fuel Boost Pump located in the aircraft fuel tank aupplies fuel to aircraft engines.

Posted Date

Mar 23, 2026

Due Date

Jun 30, 2026

Timeline Progress70%
DLA Maritime

The Defense Logistics Agency Land and Maritime is soliciting quotes for 14 units of fuel metering pump NSN 2910-01-539-1621 under solicitation SPE7L326U0520. The procurement is a Total Small Business set-aside, electronic submission only, and may result in an automated indefinite-delivery contract with a one-year term or until aggregate orders reach $350,000. Quotes are due June 1, 2026; hard copies are not available and all responsible sources may submit quotes.

Posted Date

May 17, 2026

Due Date

Jun 1, 2026

Timeline Progress98%
City of Lighthouse Point

The City of Lighthouse Point is seeking a contractor to install a new fuel pump and metering system at the Lighthouse Point Public Works facility. The project scope includes providing all necessary materials, equipment, labor, and services required for the installation. A non-mandatory pre-proposal conference is scheduled for May 20, 2026, with final proposals due by June 9, 2026.

Posted Date

May 10, 2026

Due Date

Jun 9, 2026

Timeline Progress72%
DLA Maritime

This combined synopsis/solicitation (RFQ) seeks pump, fuel, metering NSN 2910015707927 with a quantity of 43 units to be delivered to DLA Distribution. It is a Total Small Business Set-Aside and quotes may be submitted electronically via the DLA DIBBS site. The solicitation is active as of May 2026 with offers due by May 30, 2026.

Posted Date

May 19, 2026

Due Date

May 30, 2026

DLA Land

Pump, fuel, metering, NSN 2910013596543, Qty 4.

Posted Date

May 19, 2026

Due Date

Jun 3, 2026

Timeline Progress85%
DLA Land

Provide pump, fuel, metering, NSN 2910015391621, Qty 14 UI Ea

Posted Date

May 17, 2026

Due Date

Jun 1, 2026

Timeline Progress98%
DLA Aviation

Provide parts kit, metering, NSN 2915005185447, Qty 3 UI Ea

Posted Date

May 26, 2026

Due Date

Jun 3, 2026

Timeline Progress71%
DLA Aviation

Provide pump, fuel, metering, NSN 2915017190307, Qty 50 Ea

Posted Date

May 27, 2026

Due Date

Jun 12, 2026

Timeline Progress29%
DLA Land

Pump, fuel, metering, NSN 2910015707927, Qty 43.

Posted Date

May 19, 2026

Due Date

May 30, 2026

City of O'Fallon

Provide sanitary sewer flow metering services at two locations for utility billing.

Posted Date

May 8, 2026

Due Date

Jun 10, 2026

Timeline Progress72%
Bay Shore Regional Sewerage Authority

Deliver two (2) new exhaust fans.

Posted Date

May 21, 2026

Due Date

Jun 2, 2026

Timeline Progress89%

Win More Advanced Metering Infrastructure RFPs

Get AI-powered buying signals and real-time alerts for advanced metering infrastructure opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available