Discover opportunities months before the RFP drops
Learn more →Explore retail and commercial development contracts from state development agencies, county planning departments, and municipal development offices. View contract expirations for commercial construction contractors, retail development vendors, and franchise construction service providers.
WO#21-019348 HANGAR 9 RENOVATION
Effective Date
Sep 15, 2025
Expires
Effective: Sep 15, 2025
WO#21-019348 HANGAR 9 RENOVATION
AvailableDESIGN BUILD CONSTRUCTION OF REPLACE SEISMICALLY DEFICIENT BOILER PLANT, BUILDING 8. VAMC RENO, NV.
Effective Date
May 22, 2025
Expires
Effective: May 22, 2025
DESIGN BUILD CONSTRUCTION OF REPLACE SEISMICALLY DEFICIENT BOILER PLANT, BUILDING 8. VAMC RENO, NV.
AvailableGREENHOUSE CONSTRUCTION AT CRANBERRY BREEDING & GENETICS GREENHOUSE
Effective Date
Oct 14, 2024
Expires
Effective: Oct 14, 2024
GREENHOUSE CONSTRUCTION AT CRANBERRY BREEDING & GENETICS GREENHOUSE
AvailableDESIGN/BID/BUILD CONSTRUCTION PROJECT FOR THE CONSTRUCTION OF A VERTICAL SKILLS INSTRUCTIONAL FACILITY LOCATED AT JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY.
Effective Date
Jun 30, 2025
Expires
Effective: Jun 30, 2025
Expires:
DESIGN/BID/BUILD CONSTRUCTION PROJECT FOR THE CONSTRUCTION OF A VERTICAL SKILLS INSTRUCTIONAL FACILITY LOCATED AT JOINT BASE MCGUIRE-DIX-LAKEHURST, NEW JERSEY.
AvailableTHE PRIMARY OBJECTIVE OF THE PROJECT IS TO REPLACE THE PONY PEN HAY BARN. THE PROJECT SHALL DEMOLISH THE OLD BARN BUILDING DOWN TO PILINGS AND GIRDERS AND CONSTRUCTION OF NEW BARN, LEAN TOO SHED ROOF AND WALLS TO REMAIN AND BE REATTACHED TO NEW BUILD
Effective Date
Jul 21, 2025
Expires
Effective: Jul 21, 2025
Expires:
THE PRIMARY OBJECTIVE OF THE PROJECT IS TO REPLACE THE PONY PEN HAY BARN. THE PROJECT SHALL DEMOLISH THE OLD BARN BUILDING DOWN TO PILINGS AND GIRDERS AND CONSTRUCTION OF NEW BARN, LEAN TOO SHED ROOF AND WALLS TO REMAIN AND BE REATTACHED TO NEW BUILD
AvailableCONTRACTOR TO PROVIDE DESIGN AND CONSTRUCTION SERVICES TO COMPLETE THE IOWA CITY REPLACE BUILDING FOR STORAGE DESIGN-BUILD.
Effective Date
Jul 6, 2025
Expires
Effective: Jul 6, 2025
Expires:
CONTRACTOR TO PROVIDE DESIGN AND CONSTRUCTION SERVICES TO COMPLETE THE IOWA CITY REPLACE BUILDING FOR STORAGE DESIGN-BUILD.
AvailableDESIGN-BUILD CONSTRUCTION FOR DOMESTIC RESERVOIR RENOVATION
Effective Date
Sep 27, 2024
Expires
Effective: Sep 27, 2024
DESIGN-BUILD CONSTRUCTION FOR DOMESTIC RESERVOIR RENOVATION
AvailableDUPLEX CONSTRUCTION AT KYLE, PINE RIDGE, AND WANBLEE (CONSTRUCTION)
Effective Date
Sep 25, 2025
Expires
Effective: Sep 25, 2025
DUPLEX CONSTRUCTION AT KYLE, PINE RIDGE, AND WANBLEE (CONSTRUCTION)
AvailableTHIS PROJECT IS A DESIGN BID BUILD CONSTRUCTION CONTRACT FOR NBPL-582 TACTICAL COMPUTER NETWORKS ENVIRONMENT (TCNE).
Effective Date
Jun 30, 2025
Expires
Effective: Jun 30, 2025
Expires:
THIS PROJECT IS A DESIGN BID BUILD CONSTRUCTION CONTRACT FOR NBPL-582 TACTICAL COMPUTER NETWORKS ENVIRONMENT (TCNE).
AvailableDESIGN-BUILD CONSTRUCTION OF THE VETERANS AFFAIRS HEALTH CARE CENTER, EL PASO, TX
Effective Date
Dec 19, 2023
Expires
Effective: Dec 19, 2023
Expires:
DESIGN-BUILD CONSTRUCTION OF THE VETERANS AFFAIRS HEALTH CARE CENTER, EL PASO, TX
AvailableDESIGN-BUILD CONSTRUCTION FOR A SECURED FEDERAL BUILDING, NATIONAL MALL AREA, WASHINGTON D.C.
Effective Date
Oct 2, 2023
Expires
Effective: Oct 2, 2023
Expires:
DESIGN-BUILD CONSTRUCTION FOR A SECURED FEDERAL BUILDING, NATIONAL MALL AREA, WASHINGTON D.C.
AvailableDESIGN BUILD CONSTRUCTION OF FACILITIES FORT LEONARD WOOD HOSPITAL REPLACEMENT
Effective Date
Aug 8, 2019
Expires
Effective: Aug 8, 2019
Expires:
DESIGN BUILD CONSTRUCTION OF FACILITIES FORT LEONARD WOOD HOSPITAL REPLACEMENT
AvailableDESIGN/BUILD: 312 NORTH SPRING STREET ROOF REPLACEMENT PROJECT, LOS ANGELES, CALIFORNIA - MIWOK CONSTRUCTION
Effective Date
Apr 1, 2024
Expires
Effective: Apr 1, 2024
Expires:
DESIGN/BUILD: 312 NORTH SPRING STREET ROOF REPLACEMENT PROJECT, LOS ANGELES, CALIFORNIA - MIWOK CONSTRUCTION
AvailableAWARD OF CONSTRUCTION CONTRACT FOR DESIGN/BUILD CONSTRUCTION OF ARTIFICIAL INTELLIGENCE & MACHINE RESEARCH CAPABILITY CENTER (AIMR-2C) LOCATED AT WRIGHT-PATTERSON AIRFORCE BASE (WPAFB), OHIO.
Effective Date
Jun 16, 2025
Expires
Effective: Jun 16, 2025
Expires:
AWARD OF CONSTRUCTION CONTRACT FOR DESIGN/BUILD CONSTRUCTION OF ARTIFICIAL INTELLIGENCE & MACHINE RESEARCH CAPABILITY CENTER (AIMR-2C) LOCATED AT WRIGHT-PATTERSON AIRFORCE BASE (WPAFB), OHIO.
AvailableN6274223C6619 CONSTRUCTION OF SINGLE-STORY DMCC, UBON RATCHATANINI, THAILAND
Effective Date
Sep 19, 2023
Expires
Effective: Sep 19, 2023
Expires:
N6274223C6619 CONSTRUCTION OF SINGLE-STORY DMCC, UBON RATCHATANINI, THAILAND
AvailableDESIGN-BID-BUILD CONSTRUCTION TO REPAIR RETAINING WALL
Effective Date
Sep 27, 2024
Expires
Effective: Sep 27, 2024
DESIGN-BID-BUILD CONSTRUCTION TO REPAIR RETAINING WALL
AvailableDESIGN-BUILD CONSTRUCTION FOR SITE R GENERATOR REPLACEMENT
Effective Date
Sep 28, 2023
Expires
Effective: Sep 28, 2023
DESIGN-BUILD CONSTRUCTION FOR SITE R GENERATOR REPLACEMENT
AvailableC107641- THIS CONTRACT WILL ADD A TEMPORARY VEHICLE INSPECTION STATION AT THE POOLESVILLE FACILITY DURING CONSTRUCTION TO ENSURE THE SAFETY OF OCCUPANTS OF POOLESVILLE.
Effective Date
Oct 1, 2025
Expires
Effective: Oct 1, 2025
Expires:
C107641- THIS CONTRACT WILL ADD A TEMPORARY VEHICLE INSPECTION STATION AT THE POOLESVILLE FACILITY DURING CONSTRUCTION TO ENSURE THE SAFETY OF OCCUPANTS OF POOLESVILLE.
AvailableWANBLEE MODERNIZATION PHASE 1 - CONSTRUCTION / PROJECT #: GP24WB304C06
Effective Date
Aug 13, 2025
Expires
Effective: Aug 13, 2025
WANBLEE MODERNIZATION PHASE 1 - CONSTRUCTION / PROJECT #: GP24WB304C06
AvailableEffective: Aug 6, 2024
Expires:
DESIGN BUILD CONSTRUCTION
AvailableGet AI-powered buying signals and real-time alerts for retail & commercial development opportunities