Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Whitman Housing Authority
Project consists of but not limited to: Removal and replacement of existing sewer main and sewer services, abandonment of existing pump chamber and valve pit, installation of new pump chamber, pump control system, electrical conduit, emergency generator, removal and replacement of existing bituminous walkways and all other work specified in the contract documents.
Posted Date
Mar 18, 2026
Due Date
Apr 3, 2026
Release: Mar 18, 2026
Whitman Housing Authority
Close: Apr 3, 2026
Project consists of but not limited to: Removal and replacement of existing sewer main and sewer services, abandonment of existing pump chamber and valve pit, installation of new pump chamber, pump control system, electrical conduit, emergency generator, removal and replacement of existing bituminous walkways and all other work specified in the contract documents.
AvailableWhitman Housing Authority
Electrical upgrades including removal of remaining knob-and-tube and bx wiring and replacement with code-compliant NM-B/MC cabling, grounded devices, and required GFCI/AFCI protection.
Posted Date
Jan 21, 2026
Due Date
Feb 13, 2026
Release: Jan 21, 2026
Whitman Housing Authority
Close: Feb 13, 2026
Electrical upgrades including removal of remaining knob-and-tube and bx wiring and replacement with code-compliant NM-B/MC cabling, grounded devices, and required GFCI/AFCI protection.
Whitman Housing Authority
The Project consists of removal of existing deck framing, stair framing, decking, railings and footings. New footings, deck framing, stair framing, decking and railings.
Posted Date
-
Due Date
Sep 4, 2025
Whitman Housing Authority
Close: Sep 4, 2025
The Project consists of removal of existing deck framing, stair framing, decking, railings and footings. New footings, deck framing, stair framing, decking and railings.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Whitman Housing Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database