Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
West Des Moines Water Works
Repainting of masonry, repair of masonry joints, replacement of doors, and repainting in various structures. Replacement of motor-operated valves, an aeration blower, and aeration piping.
Posted Date
Jun 18, 2026
Due Date
Jul 23, 2026
Release: Jun 18, 2026
West Des Moines Water Works
Close: Jul 23, 2026
Repainting of masonry, repair of masonry joints, replacement of doors, and repainting in various structures. Replacement of motor-operated valves, an aeration blower, and aeration piping.
AvailableWest Des Moines Water Works
Work consists of approx. furnish all labor, materials and equipment necessary to construct the project, including exterior overcoating, wet interior repainting, pit piping repainting, dry interior spot repainting, and miscellaneous associated work. The tank has a diameter of 100 ft. with a high-water level of 145 ft.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
West Des Moines Water Works
Close: Feb 12, 2026
Work consists of approx. furnish all labor, materials and equipment necessary to construct the project, including exterior overcoating, wet interior repainting, pit piping repainting, dry interior spot repainting, and miscellaneous associated work. The tank has a diameter of 100 ft. with a high-water level of 145 ft.
West Des Moines Water Works
Work consists of 1,539 LF of water main, trenchless, PVC, 12" (restrained joint); 115 LF of water main, trenchless, PVC, 8" (restrained joint); 1,677 LBS of fittings by weight, DI, MJ, AWWA C153; 1,650 LF of filter sock, install and maintain; 1,650 LF of filter sock, remove.
Posted Date
Jan 21, 2026
Due Date
Feb 5, 2026
Release: Jan 21, 2026
West Des Moines Water Works
Close: Feb 5, 2026
Work consists of 1,539 LF of water main, trenchless, PVC, 12" (restrained joint); 115 LF of water main, trenchless, PVC, 8" (restrained joint); 1,677 LBS of fittings by weight, DI, MJ, AWWA C153; 1,650 LF of filter sock, install and maintain; 1,650 LF of filter sock, remove.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from West Des Moines Water Works
The Board approved amendments to the 28E/28F Agreements, which will now be presented to member agencies for consideration. The meeting also addressed the implementation of a Stage II Water Alert, calling for a voluntary 50% reduction in lawn watering, and noted the addition of a new Water Use Plan section on the organization's website to assist customers with conservation efforts.
The Board meeting agenda included a financial report, the approval of several water supply service agreements for various developments, and the acceptance of a public easement and infrastructure improvements. The Board addressed personnel recommendations, specifically an employment agreement for the General Manager, reviewed the independent auditor's report, and discussed amendments to a regional water agreement. Additionally, staff recommendations covered construction service contracts, insurance premiums, and the scheduling of a public hearing regarding property disposal. Construction project actions included planning for facility repairs and the authorization of bill payments for various projects, alongside reports on water quality and project progress.
The Board reviewed and approved financial reports, a memorandum of agreement amendment with WB Realty, and a draft capital improvements plan. Various resolutions were adopted concerning completed water system improvements, the acceptance of permanent public easements and rights-of-way, and an agreement for water main replacements. The Board also ratified the hiring of new staff members. Administrative updates included reports on ongoing construction projects, water treatment and distribution operations, a review of backflow testing procedures, and updates regarding Central Iowa Water Works board activities.
This Strategic Plan outlines the commitment of West Des Moines Water Works to provide a consistently safe and reliable water supply and serve its customers responsibly. The organization's vision is to be a model public utility, recognized for quality, setting industry standards, and delivering excellent customer service. Key strategic pillars include maintaining and exceeding water quality and safety standards, upgrading and improving water assets and infrastructure, providing for future community growth, acting with fiscal responsibility and accountability, and fostering cooperation, collaboration, and communication.
The Board of Trustees discussed and passed a resolution accepting the completed construction of the SE 35th Street Water Main Extension project. The action included authorization for the final retainage payment to the contractor, Sandstone Management LTD, and noted that the final project cost was $245,478.09. Additionally, the maintenance bond for the project was set to expire four years following the date of the board's acceptance.
Extracted from official board minutes, strategic plans, and video transcripts.
Track West Des Moines Water Works's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge