Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Wendover Airport
Removal of old/obsolete pavement between the approach end of Runway 12 and Taxiway B, south of Taxiway B1. Along with the removal, this area will be re-graded to minimize the longitudinal grade breaks within the Runway Safety Area of Runway 12/30. Extension/relocation of the existing drainage infrastructure on the north side of Runway 12/30 to locations outside of the Runway Safety Area.
Posted Date
May 27, 2026
Due Date
Jun 17, 2026
Release: May 27, 2026
Wendover Airport
Close: Jun 17, 2026
Removal of old/obsolete pavement between the approach end of Runway 12 and Taxiway B, south of Taxiway B1. Along with the removal, this area will be re-graded to minimize the longitudinal grade breaks within the Runway Safety Area of Runway 12/30. Extension/relocation of the existing drainage infrastructure on the north side of Runway 12/30 to locations outside of the Runway Safety Area.
AvailableWendover Airport
Removal and replacement of 1,500 SY of 6" cement concrete pavement. Following the removal of the existing pavement, the existing underlying base course shall be reconditioned and recompacted prior to the placement of new concrete. This project will also include the application of pavement markings.
Posted Date
Oct 14, 2025
Due Date
Oct 30, 2025
Release: Oct 14, 2025
Wendover Airport
Close: Oct 30, 2025
Removal and replacement of 1,500 SY of 6" cement concrete pavement. Following the removal of the existing pavement, the existing underlying base course shall be reconditioned and recompacted prior to the placement of new concrete. This project will also include the application of pavement markings.
Wendover Airport
Construction of an 80'x45' pre-engineered metal building with three 20-foot wide by 16-foot high bay doors. The project will include utility services to the building, along with exterior concrete for the driveway/apron and an employee parking area.
Posted Date
May 30, 2025
Due Date
Jun 25, 2025
Release: May 30, 2025
Wendover Airport
Close: Jun 25, 2025
Construction of an 80'x45' pre-engineered metal building with three 20-foot wide by 16-foot high bay doors. The project will include utility services to the building, along with exterior concrete for the driveway/apron and an employee parking area.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge