Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Ware Housing Authority
Work include parking lot replacement project consists of a new annex parking lot, connecting sidewalks, cement concrete dumpster pad, and three additional parking stalls to the limits and locations shown on the plan. The construction effort includes the excavation, removal, and disposal of existing bituminous and cement concrete, curbing, unsuitable gravel subbase, and import of processed gravel for subbase and all required materials for the proper construction of the new vehicle travel ways, parking areas, sidewalks, curbing, dumpster pad, etc.
Posted Date
May 20, 2026
Due Date
Jun 10, 2026
Release: May 20, 2026
Ware Housing Authority
Close: Jun 10, 2026
Work include parking lot replacement project consists of a new annex parking lot, connecting sidewalks, cement concrete dumpster pad, and three additional parking stalls to the limits and locations shown on the plan. The construction effort includes the excavation, removal, and disposal of existing bituminous and cement concrete, curbing, unsuitable gravel subbase, and import of processed gravel for subbase and all required materials for the proper construction of the new vehicle travel ways, parking areas, sidewalks, curbing, dumpster pad, etc.
AvailableWare Housing Authority
Parking Lot replacement.
Posted Date
May 20, 2026
Due Date
May 20, 2026
Release: May 20, 2026
Ware Housing Authority
Close: May 20, 2026
Parking Lot replacement.
Ware Housing Authority
The Project consists of replacing the existing windows with insert double-hung windows and full-frame sliding windows at four 2-story residential buildings.
Posted Date
Mar 25, 2026
Due Date
May 22, 2026
Release: Mar 25, 2026
Ware Housing Authority
Close: May 22, 2026
The Project consists of replacing the existing windows with insert double-hung windows and full-frame sliding windows at four 2-story residential buildings.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge