Dry Creek Bridge Wingwall Repair Project At Alvarado-Niles Road RFP
Jul 29, 2026
Closes
Aug 17, 2026
Work generally includes removal and disposal of existing wingwall, footing, and barrier; excavation and backfill; temporary shoring; temporary water pollution control measures; construction of a new wingwall, footing and barrier; removal and reconstruction of portion sidewalk and paved trail; removal and replacement of wood rail and posts; and paint lumber and timber.
