Nswc Compressed Air Replacement System RFP
Jul 28, 2026
Closes
Aug 14, 2026
DESIGN-BUILD: Project is intended to design a compressed air distribution system to support Building 517 laboratory operations. The contractor must also remove the existing system and provide a complete compressed air infrastructure including new piping, equipment, and controls. The system must deliver reliable air supply to laboratory tools and equipment, integrating moisture and particulate filtration, monitoring, and condensate management to maintain performance and efficient.