Point Repair of Sanitary Sewers with Cured-In-Place Pipe RFP
Aug 6, 2026
Closes
Aug 18, 2026
Project consists of point repair of sanitary sewers with cured-in-place pipe, being seven (7) locations in 8" pipe and one (1) location in 12" pipe (all locations 4 feet maximum length).