2026 Road Improvement RFP
Posted
Sep 2, 2026
Sep 9, 2026
Approx. 80,907 SY HMA milling, 0-2", 9,853 tons HMA Surface Course, with pavement repair areas to be determined after milling is completed, 10,040 sy Remove and Replace Roadway Base (if and where directed), 7,800 lbs Wide Crack Repair (mastic - if and where directed). Additional work includes reconstruction of ADA ramps, repair/replacement of granite block/concrete curb & concrete sidewalk if and where directed, and traffic control & signage.