Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Township of Pennsville
The Township of Pennsville is soliciting bids for the purchase of water chemicals for its Water Department for the period of July 1, 2026 through June 30, 2027. The solicitation includes approximately 330 Liquid Tons of Aluminum Sulfate, 250 Tons of Hydrated Lime, and Sodium chemicals. Bids will be received and opened on June 23, 2026 at 10:00 am.
Posted Date
Jun 8, 2026
Due Date
Jun 23, 2026
Release: Jun 8, 2026
Township of Pennsville
Close: Jun 23, 2026
The Township of Pennsville is soliciting bids for the purchase of water chemicals for its Water Department for the period of July 1, 2026 through June 30, 2027. The solicitation includes approximately 330 Liquid Tons of Aluminum Sulfate, 250 Tons of Hydrated Lime, and Sodium chemicals. Bids will be received and opened on June 23, 2026 at 10:00 am.
AvailablePennsville Sewerage Authority
Replacing the existing 6" asbestos cement force main serving Pumping Station No. 4 with a new 6" CLDIP and HDPE force main. Installation will be completed using both open cut and directional drilling methods. A key portion of the work involves a long directional drill under the New Jersey Turnpike, I-295, and the Salem Canal, with the new 6-inch carrier pipe installed inside 12" HDPE casing pipe using casing spacers. The project also includes new ductile iron yard piping at the pump station, air release and bypass vaults, a new terminal doghouse manhole, and full restoration of all disturbed areas. A bypass pumping setup will be required to keep the system in operation during the switchover.
Posted Date
Apr 20, 2026
Due Date
May 21, 2026
Release: Apr 20, 2026
Pennsville Sewerage Authority
Close: May 21, 2026
Replacing the existing 6" asbestos cement force main serving Pumping Station No. 4 with a new 6" CLDIP and HDPE force main. Installation will be completed using both open cut and directional drilling methods. A key portion of the work involves a long directional drill under the New Jersey Turnpike, I-295, and the Salem Canal, with the new 6-inch carrier pipe installed inside 12" HDPE casing pipe using casing spacers. The project also includes new ductile iron yard piping at the pump station, air release and bypass vaults, a new terminal doghouse manhole, and full restoration of all disturbed areas. A bypass pumping setup will be required to keep the system in operation during the switchover.
Township of Pennsville
Providing and delivering one (1) used chevrolet 5500 truck (or equivalent).
Posted Date
Feb 11, 2026
Due Date
Feb 26, 2026
Release: Feb 11, 2026
Township of Pennsville
Close: Feb 26, 2026
Providing and delivering one (1) used chevrolet 5500 truck (or equivalent).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $1,000, use sole source.
Coops: Long-term, consider educating on coops (1NJCP, ESCNJ, Sourcewell, NASPO ValuePoint) as efficiency options; buyer hasn’t historically used coops, but you can encourage them to explore these procurement programs as future options.
Township of Pennsville shows no sole source awards (2020–2024). Deprioritize this path.
Practical notes:
Board meetings and strategic plans from Township of Pennsville
The budget includes revenues from surplus, local sources, state aid, grants, and delinquent taxes. Appropriations cover operating expenses, deferred charges, capital improvements, debt service, and a reserve for uncollected taxes. It details the calculation of the spending and levy caps, including adjustments for shared service agreements, health insurance, pension obligations, capital improvements, and debt service. The budget also outlines the municipality's employee group insurance costs and contributions.
The Pennsville Sewerage Authority meeting addressed several key operational and financial matters. These included the approval of payments, authorizing a fund transfer, and approving contracts for lawn maintenance and the purchase of a pump. Reports were given on the status of pumping station repairs, the progress of RBC plans and specifications with the DEP, and the need for manhole rehabilitation. An executive session was held to discuss an employment matter, resulting in the authorization of a five-year employment contract with the current Assistant Superintendent.
The Pennsville Sewerage Authority meeting addressed several key issues. A cost of living increase for office staff was approved, resulting in a 2% salary increase for administrative employees, retroactive to January 1, 2021. The engineer reported on various projects, including a Form F for a warehouse, a pumping station preconstruction meeting, a site-specific amendment for Tufts Road, and a planning document for wastewater treatment plant improvements. The ETS Project Manager reported on a forcemain break repair, a completed lining project, and an influent pump requiring repairs.
The Pennsville Sewerage Authority meeting addressed several key resolutions. These included approving payment of bills, authorizing the renewal of membership in the New Jersey Utility Authorities Joint Insurance Fund, extending the suspension of the Authority's collection process, authorizing the issuance of subordinate bonds for various projects (Pumping Station No. 3, Rotating Biological Contractors, and Sludge Thickener Projects), authorizing the execution of a proposal for the Sludge Thickening System Project, authorizing the solicitation of bids for the Pump Station #3 Force Main Project, and authorizing an amended contract with Teamsters Local Union No. 676. Reports from the engineer and superintendent covered various projects and maintenance issues. Discussion also included the upcoming school year and its impact on the Deputy Clerk's work schedule.
The Pennsville Sewerage Authority meeting covered several key topics. The board approved the payment of bills, a one-year contract extension with Standard Pipe Services LLC (not to exceed $250,000), and a contract with Duke's Sewer Root Control Specialists (not to exceed $10,000). They also approved an amendment to extend the suspension of the Authority's collection process/water turnoff procedure until August 1, 2020. Reports were given on the sludge pumping system project, the RBC's project, the force main project, and various completed maintenance tasks. Discussion also included a gas main issue on R.J. Raine's property and upcoming concrete work on E. Pittsfield Street. Finally, an update was provided on Chad Hoglen's progress in completing required classes.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Township of Pennsville's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge