Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Twin Bridges's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Twin Bridges
The project consists of removing the existing line shaft turbine pumps and motors at each well, performing down-hole video surveys of the well casing and screen before and after well redevelopment, short-term pumping tests before and after well redevelopment, conducting one or more redevelopment activities as specified herein, providing and installing new submersible pumps, wiring, columns, sounding tubes, and performing pumping tests to verify pump operation, well performance, and estimate aquifer parameters, and furnishing and installing a new flow meter and piping appurtenances at each well house.
Posted Date
Jan 15, 2026
Due Date
Feb 3, 2026
Release: Jan 15, 2026
Town of Twin Bridges
Close: Feb 3, 2026
The project consists of removing the existing line shaft turbine pumps and motors at each well, performing down-hole video surveys of the well casing and screen before and after well redevelopment, short-term pumping tests before and after well redevelopment, conducting one or more redevelopment activities as specified herein, providing and installing new submersible pumps, wiring, columns, sounding tubes, and performing pumping tests to verify pump operation, well performance, and estimate aquifer parameters, and furnishing and installing a new flow meter and piping appurtenances at each well house.
AvailableTown of Twin Bridges
Work includes approx 581 LF of 8" polyvinyl chloride water main; 274 LF of polyethylene water service line; 8 EA water service connection. See outside link.
Posted Date
Feb 27, 2025
Due Date
Apr 2, 2025
Release: Feb 27, 2025
Town of Twin Bridges
Close: Apr 2, 2025
Work includes approx 581 LF of 8" polyvinyl chloride water main; 274 LF of polyethylene water service line; 8 EA water service connection. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.