Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Surf City
Construction of proposed permeable pavers at the intersection, which will reduce flooding on south shore drive. The proposed infiltration system includes approx. 96 LF of 4" PVC (Polyvinyl Chloride) pipe, 2 traffic bearing drop inlets, approx. 204 SY of permeable pavers, traffic control, and erosion control.
Posted Date
Jul 2, 2026
Due Date
Aug 3, 2026
Release: Jul 2, 2026
Town of Surf City
Close: Aug 3, 2026
Construction of proposed permeable pavers at the intersection, which will reduce flooding on south shore drive. The proposed infiltration system includes approx. 96 LF of 4" PVC (Polyvinyl Chloride) pipe, 2 traffic bearing drop inlets, approx. 204 SY of permeable pavers, traffic control, and erosion control.
AvailableTown of Surf City
Construction of two well pump houses including pumps and associated equipment, 12” Raw water pipelines and interconnections, Distribution pipelines 8” and 12”, Some of the above pipelines to be constructed by Jack and Bore, and Horizontal Directional Drilling methods, Service connections, fire hydrants, and gate valves, air release valves and other related works. Construction of a 10 feet wide walkway, approximately 3,700 ft long, along North Shore Drive.
Posted Date
Nov 27, 2025
Due Date
Dec 4, 2025
Release: Nov 27, 2025
Town of Surf City
Close: Dec 4, 2025
Construction of two well pump houses including pumps and associated equipment, 12” Raw water pipelines and interconnections, Distribution pipelines 8” and 12”, Some of the above pipelines to be constructed by Jack and Bore, and Horizontal Directional Drilling methods, Service connections, fire hydrants, and gate valves, air release valves and other related works. Construction of a 10 feet wide walkway, approximately 3,700 ft long, along North Shore Drive.
Town of Surf City
The proposed infiltration system includes approx. 43 LF of 12" Class V RCP (Reinforced Concrete Pipe), 116 LF of 6" PVC (Polyvinyl Chloride), one (1) traffic bearing drop inlet (TBDI), approx. 442 SY of permeable pavers, traffic control, and erosion control.
Posted Date
Oct 15, 2025
Due Date
Nov 14, 2025
Release: Oct 15, 2025
Town of Surf City
Close: Nov 14, 2025
The proposed infiltration system includes approx. 43 LF of 12" Class V RCP (Reinforced Concrete Pipe), 116 LF of 6" PVC (Polyvinyl Chloride), one (1) traffic bearing drop inlet (TBDI), approx. 442 SY of permeable pavers, traffic control, and erosion control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If proprietary/continuity of service (especially water/wastewater), build a justification with the department head and route through the Town Manager for board approval.
Coops: Buy via Sourcewell or a North Carolina State Contract; confirm eligibility with the Town Manager/Finance to bypass informal bidding.
Entity: Town of Surf City, NC.
Approach: Position the product as proprietary and essential for continuity of service, particularly where it integrates with water/wastewater systems.
Board meetings and strategic plans from Town of Surf City
The Council discussed the results of the annual holiday decorating competition, received an update on the progress and budget status of the facilities expansion project involving Station 25 and the Public Utilities building, reviewed a resolution opposing the Fuquay-Varina inner basin transfer request, and agreed to dissolve the GTCAC committee. Additionally, the Council appointed delegates and alternates for the Cape Fear Council of Governments and the Eastern Carolina Council and discussed the future of the four town meetings.
The council meeting included the presentation of Beautification and Enhancement Committee awards for business and home of the month, the recognition of a former mayor as a hometown hero, the presentation of a proclamation to a local surfing champion, and a proclamation declaring July as Parks and Recreation Month. Additionally, the town attorney addressed a procedural issue regarding notification for a special use permit hearing for a dry stack project.
The Planning Board discussed several development and zoning items, including a conditional rezoning request for a proposed 118-room hotel at 230 E. Florence Way and a rezoning request to the Government District for 214 W. Florence Way. Additionally, the Board reviewed a major site plan for the Sugar Creek commercial complex and discussed reclassifying the Job Growth Corridor to the Economic Resiliency Corridor. Other topics included an inquiry regarding the role of the Planning Board and potential regulation of short-term rental taxes.
The meeting served as a forum for presenting the General Reevaluation Report and Environmental Assessment regarding the Surf City beach re-nourishment project. Discussion topics included an overview of the project's recommended plan, which involves a reduction in project length and adjustments to sand volume requirements. Additional focus areas included environmental compliance, the impact of environmental windows on construction schedules, project economics, and procedures for public input and comment submission.
The Council held a workshop to discuss a conditional district rezoning request for the Applewood Trace development. Key topics included the project's development history, a reduction in the total number of proposed residential units, the elimination of apartment units, changes to traffic generation projections, and wastewater management plans. Residents of the existing Turtle Creek neighborhood presented concerns regarding increased traffic, potential safety risks to pedestrians and children, local flooding issues, and the impact of the proposed connectivity on their community. The session also addressed zoning ordinances regarding infrastructure, street dedication, and the feasibility of restricting certain access points.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Surf City's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge