2026 - W. Michigan Ave. Sidewalk Improvement Project Town of Southern Pines RFP
Posted
-
Nov 12, 2026
Work includes mobilization, 20 LF 30" fiber reinforced concrete curb and gutter (including installation of asphalt between existing road and new curb), 416 LF 4" x 5' fiber reinforced concrete sidewalk, 26 SY 6" x 5' fiber reinforced concrete sidewalk/driveway, 3 EA ADA directional ramp (including detectable warning domes), 1060 LF 30" fiber reinforced concrete curb and gutter (including installation of asphalt between existing road and new curb), 4 EA single 24x30 hood and grate catch basin, 3 EA flume inlet, 2 EA manhole cover and lid to existing drop box, 450 LF 4" x 5' fiber reinforced concrete sidewalk. See attached file.

