Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Selma
Project will consist of furnishing, erecting, painting, testing, and disinfection of one (1) 500,000 gallon multi-leg elevated storage tank including site work, grading, erosion control, altitude valve vault, outlet structure, and site piping as specified and shown on the drawings. The bid shall also include the design, furnishing, and construction of the tank foundation based on the provided subsurface investigation, specifications, and special provisions. Additionally, the project will include approximately 75 LF of 12" C900 PVC and 5 LF of 12" DIP PC350 off-site potable water main and all associated valves and appurtenances to connect the elevated storage tank to the existing water system.
Posted Date
May 26, 2026
Due Date
Jul 2, 2026
Release: May 26, 2026
Town of Selma
Close: Jul 2, 2026
Project will consist of furnishing, erecting, painting, testing, and disinfection of one (1) 500,000 gallon multi-leg elevated storage tank including site work, grading, erosion control, altitude valve vault, outlet structure, and site piping as specified and shown on the drawings. The bid shall also include the design, furnishing, and construction of the tank foundation based on the provided subsurface investigation, specifications, and special provisions. Additionally, the project will include approximately 75 LF of 12" C900 PVC and 5 LF of 12" DIP PC350 off-site potable water main and all associated valves and appurtenances to connect the elevated storage tank to the existing water system.
AvailableTown of Selma
The project will consist of upgrading (4) Well Sites including well head, building, electrical, site work, and abandonment of (1) existing well. Additionally, 4,369 LF of 6-inch PVC C900 raw water main will be installed by open cut, 2,511 LF of 8-inch PVC C900 raw water main will be installed by open cut, 350 LF of 8-inch FPCS C900 raw water main via Horizontal Direction Drill, 50 LF Bore and Jack- 16-inch Steel Casing with 8-inch DIP PC Carrier Pipe including connections to the existing raw water mains, clearing and grubbing, erosion control measures, removal and replacement of asphalt pavement, concrete sidewalks, driveways, curb & gutter, and site restoration. The project will also include the installation of approximately 4,603 LF of 8-inch PVC C900 potable water main by open cut, 80 LF of DIP PC350 potable water main by open cut, 340 LF of 8-inch FPVC C900 potable water main by horizontal directional drill, 320 LF of 16-inch steel casing with 8-inch DIP PC350 potable water main by bore and jack, 5,716 LF of 6-inch PVC C900 potable water main by open cut, 1,105 LF of 6-inch DIP PC350 potable water main by open cut, 72 LF of 4-inch DIP PC350 potable water main by open cut, 81 LF of 2-inch PVC ASTM 2241, SDR21 water main by open cut, and all associated appurtenances, valves, hydrants, and services
Posted Date
Aug 21, 2025
Due Date
Sep 11, 2025
Release: Aug 21, 2025
Town of Selma
Close: Sep 11, 2025
The project will consist of upgrading (4) Well Sites including well head, building, electrical, site work, and abandonment of (1) existing well. Additionally, 4,369 LF of 6-inch PVC C900 raw water main will be installed by open cut, 2,511 LF of 8-inch PVC C900 raw water main will be installed by open cut, 350 LF of 8-inch FPCS C900 raw water main via Horizontal Direction Drill, 50 LF Bore and Jack- 16-inch Steel Casing with 8-inch DIP PC Carrier Pipe including connections to the existing raw water mains, clearing and grubbing, erosion control measures, removal and replacement of asphalt pavement, concrete sidewalks, driveways, curb & gutter, and site restoration. The project will also include the installation of approximately 4,603 LF of 8-inch PVC C900 potable water main by open cut, 80 LF of DIP PC350 potable water main by open cut, 340 LF of 8-inch FPVC C900 potable water main by horizontal directional drill, 320 LF of 16-inch steel casing with 8-inch DIP PC350 potable water main by bore and jack, 5,716 LF of 6-inch PVC C900 potable water main by open cut, 1,105 LF of 6-inch DIP PC350 potable water main by open cut, 72 LF of 4-inch DIP PC350 potable water main by open cut, 81 LF of 2-inch PVC ASTM 2241, SDR21 water main by open cut, and all associated appurtenances, valves, hydrants, and services
Town of Selma
The project consist of approx 4,603 LF 8" PVC via open cut; 5,716 LF 6" PVC via open cut; 1,105 LF 6" DIP via open cut; 340 LF 8" FPVC via horizontal directional boring; 320 LF 16" steel casing via jack and bore with 8" DIP.
Posted Date
Jul 1, 2025
Due Date
Sep 11, 2025
Release: Jul 1, 2025
Town of Selma
Close: Sep 11, 2025
The project consist of approx 4,603 LF 8" PVC via open cut; 5,716 LF 6" PVC via open cut; 1,105 LF 6" DIP via open cut; 340 LF 8" FPVC via horizontal directional boring; 320 LF 16" steel casing via jack and bore with 8" DIP.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; pivot to a coop or the NC statewide IT channel instead.
Coops: Use a cooperative already available to the town (e.g., CCPA or Sourcewell). Validate with Finance and the department head.
Town of Selma, NC: No evidence of sole source awards and an emphasis on lowest responsible bidder.
Board meetings and strategic plans from Town of Selma
The document outlines the fees and charges for various services provided by the Town of Selma, including animal control, cemetery services, civic center rentals, code enforcement, fire department inspections and permits, library charges, parks and recreation programs, planning and zoning applications, system development, police permits, mausoleum spaces, miscellaneous services, sanitation, taxes, utility deposits, water and sewer rates, electric connection charges, area lighting, electric rates, renewable energy credits, facilities repayment, load management, and commercial electric vehicle charging station services.
The Town of Selma's budget for the fiscal year ending June 30, 2022, includes a balanced budget of $21,238,589, which is a 2.2% decrease from the previous year. The budget focuses on infrastructure needs, capital projects, equipment upgrades, and personnel enhancements. It addresses playground improvements, electric circuits, technology replacements, police and fire equipment, and vehicles for public works and water departments. Personnel priorities include a Cross Connection Coordinator for Sewer, a part-time Fire Inspector, and upgrades for Fire Engineer positions. Utility rates for water and sewer are recommended for increase, while electric rates remain unchanged. The budget also covers General Fund revenues and expenditures, including property tax, sales tax, and utility franchise tax. Capital projects and equipment exceeding $5,000 are listed, and fund balances for various funds are detailed.
The budget includes strategic goals such as creating a safe and economically vibrant town, fostering a people-friendly community with recreational activities, maintaining the town's infrastructure, enhancing customer service, and proactively marketing Selma. The budget addresses infrastructure needs, capital projects, equipment, personnel, insurance premiums, and utility fees. It also covers general fund revenues, property tax, sales tax, utility franchise tax, electric fund transfer to the general fund, and Powell Bill revenue. General fund expenditures, capital projects, and equipment are also outlined, along with fund balances in the general fund and enterprise funds. The budget addresses water, sewer, and electric funds, including revenues, expenditures, and capital reserves.
The Town Council discussed and approved the annual budget for the fiscal year ending June 30, 2021. Key areas of focus included infrastructure, economic development, code enforcement, and community appearance. The budget allocates significant funding towards public safety, specifically fire and police protection. The council addressed various budget scenarios, considering factors such as fund balance utilization and the impacts of COVID-19 on revenue projections. Adjustments were made to the tax rate and water and sewer rates to ensure financial stability and address infrastructure needs.
The document outlines the fees and charges for various services provided by the Town of Selma, including animal control, cemetery, civic center, code enforcement, fire department, library, parks and recreation, planning department, system development, police, mausoleum, sanitation, taxes, and utilities. It includes specific fees for grave spaces, grave openings, cemetery markers, civic center rentals, code enforcement violations, fire inspections, library charges, athletic programs, planning and zoning applications, system development for water and wastewater, taxicab permits, mausoleum spaces, sanitation services, utility deposits, water and sewer rates, and electric services.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Selma's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge