Tennis Court Reconstruction At Jacob Ford Park RFP
Jul 30, 2026
Closes
Aug 11, 2026
Work includes approx Excavation, Unclassified – 687 C.Y., Concrete Surface Course, 8" Thick, FiberReinforced – 1 L.S., Furnish and Install 4" Corrugated Double-Wall HDPE Perforated Drain Pipe – 621 L.F., PVC Cleanout with Corrugated Pipe Adapter – 4 Units, Riprap Outlet Protection, 8" Thick (D50 = 4" to 6") – 1 L.S., Chain-Link Fence, Black Polyolefin-Coated Steel, 12' High – 383 L.F., Gate, Chain-link, Black Polyolefin-Coated Steel, 3.5' Wide x 7' High – 2 Units, Concrete Sidewalk, 5" Thick – 6 S.Y., Furnish and Install Laykold Masters Color [or Approved Equal] Acrylic Tennis Court Athletic Surfacing System – 1 L.S., Furnish and Install Tennis Net System, Complete with Posts, Footings, Center Anchor, and Net (Douglas Sports TN-45 or Approved Equal) – 1 L.S., Retaining Wall, Quarry Boulder, 1' to 6' High x 2.5' to 3' Thick – 310 S.F.
