Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Manteo
Work includes town hall renovation.
Posted Date
Jul 20, 2026
Due Date
Aug 24, 2026
Release: Jul 20, 2026
Town of Manteo
Close: Aug 24, 2026
Work includes town hall renovation.
AvailableTown of Manteo
Project includes the replacement of approx 672 LF of gravity sewer main. The project also includes replacing 14, 4" pvc sewer service line connections, replacing 3 four-foot diameter manholes, implementing site/pavement repairs, implementing erosion and sediment control measures, installing and maintaining traffic control measures, bypass pumping, connecting to the existing sewer main, and removing the existing sewer main and the existing manholes.
Posted Date
Sep 14, 2025
Due Date
Oct 8, 2025
Release: Sep 14, 2025
Town of Manteo
Close: Oct 8, 2025
Project includes the replacement of approx 672 LF of gravity sewer main. The project also includes replacing 14, 4" pvc sewer service line connections, replacing 3 four-foot diameter manholes, implementing site/pavement repairs, implementing erosion and sediment control measures, installing and maintaining traffic control measures, bypass pumping, connecting to the existing sewer main, and removing the existing sewer main and the existing manholes.
Town of Manteo
Work includes interior demolition, removal of several interior walls, electrical systems, plumbing systems, communication systems and asbestos.
Posted Date
Sep 7, 2025
Due Date
Sep 24, 2025
Release: Sep 7, 2025
Town of Manteo
Close: Sep 24, 2025
Work includes interior demolition, removal of several interior walls, electrical systems, plumbing systems, communication systems and asbestos.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Town of Manteo
The board discussed updates to the flood damage prevention ordinance to ensure compliance with the 2026 model standards from the North Carolina Department of Public Safety and FEMA, including discussions regarding fill standards, VE zones, and enforcement procedures. Additionally, the board reviewed a special use permit application to convert a property at 417 Agona Street from a retail florist into a coffee shop and bakery, covering aspects related to parking requirements, site layout, and compatibility with the town's land use plan.
The committee discussed a Special Use Permit amendment for fencing at the Spectrum facility, recommending approval with specific aesthetic conditions. Committee members also addressed concerns regarding deteriorating properties, maintenance of vegetation buffers, the status of ongoing development projects, the implementation of a timer for string lighting, and current downtown aesthetics.
The board discussed several key police updates, including community education and outreach initiatives, the current status of e-bike regulations in North Carolina, and departmental recruitment and vehicle fleet management. Additionally, board members addressed local safety concerns, such as red-light violations at specific intersections, speeding traffic in residential areas, and the operational status of skate park lighting.
The committee reviewed and recommended approval for a Special Use Permit amendment concerning fencing at 311 John Borden Street, specifying requirements for material color and style. Discussions covered maintenance issues regarding hanging utility wires, the deteriorating condition of a Brightspeed-owned building, property maintenance concerns on Fernando Street, and the status of local vacant lots. The committee also addressed the implementation of timer controls for exterior string lighting, ongoing improvements at the Marshes Light boardwalk, the status of SAGA Development projects including potential hotel and marina basin plans, and noted a vacancy within the committee membership.
The committee discussed and approved plans for an addition to 510 Sir Walter Raleigh Street, specifically addressing architectural details such as roof pitch, foundation treatment, and the requirement for diagonal lattice. Project updates were provided regarding the Davis House renovation and the Spectrum buffer restoration efforts. The committee also addressed concerns regarding loose utility cables and discussed the development of a new nuisance ordinance focused on structural safety and the enforcement of standards for deteriorating properties.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Manteo's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge