Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Town of Lake Lure
Construction of: approx. 1,800 LF of 6" HDPE sanitary force main installed by horizontal directional drill. approx. 750 LF of 3" HDPE sanitary force main installed by horizontal directional drill. approx. 260 LF of 6" HDPE sanitary force main extension installed by open cut. Two duplex pump stations; one station with a pump rate of 33 GPM, the other station with a pump rate of 89 GPM. This includes all sitework and on-site utilities.
Posted Date
Jul 6, 2026
Due Date
Jul 28, 2026
Release: Jul 6, 2026
Town of Lake Lure
Close: Jul 28, 2026
Construction of: approx. 1,800 LF of 6" HDPE sanitary force main installed by horizontal directional drill. approx. 750 LF of 3" HDPE sanitary force main installed by horizontal directional drill. approx. 260 LF of 6" HDPE sanitary force main extension installed by open cut. Two duplex pump stations; one station with a pump rate of 33 GPM, the other station with a pump rate of 89 GPM. This includes all sitework and on-site utilities.
AvailableTown of Lake Lure
Construction of 1400 LF of 18 foot wide connector road.
Posted Date
May 23, 2025
Due Date
Jun 17, 2025
Release: May 23, 2025
Town of Lake Lure
Close: Jun 17, 2025
Construction of 1400 LF of 18 foot wide connector road.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Town of Lake Lure
The agenda includes the election of officers and consideration of a variance request for the property located at 327 North Shore Drive, which seeks to reduce the riprap reinforcement requirement for a seawall.
The board convened for a regular meeting. There were no public comments, old business, or new business to address during the session.
The scheduled regular meeting of the Board of Adjustment was officially canceled.
The board meeting agenda focused on several key items including the discussion of ABC store operations and the establishment of social media communication standards. Additionally, the board reviewed the timeline for Carolina Data Services, examined the financial report, and evaluated the budget for approval.
The board conducted a review of Section 6-51 of the Lake Structures Ordinances, focusing on design and construction standards. Discussions addressed shoreline and structure limits, boathouse setback and projection restrictions, and the necessity of strict enforcement for safety and erosion control. The board also examined the implications of storm-related damage and recovery, noting the deadline extension for rebuilding damaged structures. Additionally, members discussed potential regulatory gaps regarding engineering requirements for accessory structures and the challenges of applying ordinance constraints to varying shoreline geometries.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Town of Lake Lure's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge