Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: No evidence of use—deprioritize and respond to formal solicitations.
Coops: Buyer hasn’t historically used coops; suggest exploring NC Statewide Term Contracts (Non-IT), NCDIT Statewide IT Contracts, OMNIA Partners, or Sourcewell.
Town of Canton, NC: No evidence of sole source contracting in public records. Deprioritize this path.
Practical notes:
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Canton's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Parks & Recreation/Town Clerk
Water & Sewer Department Head
Deputy Finance Director
Street Superintendent
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Canton
Project should provide features for recreational uses (greenway, paths, river access, etc. ) and the design should be resilient nature based. The demolition of the wastewater treatment facility, mill structures, and associated infrastructure. Update and refine flood risk reduction measures (floodplain benching and low head dam removal) using post-helene data and modeling, collect geotechnical and engineering data to further inform and explore these measures. Develop a preliminary project plan for implementing measures 1-3, which will include identifying and securing funding, preparation of 30% engineering designs, alternative analysis, outline project tasks and phases, and estimates for cost and schedules.
Posted Date
Dec 12, 2025
Due Date
Jan 19, 2026
Release: Dec 12, 2025
Town of Canton
Close: Jan 19, 2026
Project should provide features for recreational uses (greenway, paths, river access, etc. ) and the design should be resilient nature based. The demolition of the wastewater treatment facility, mill structures, and associated infrastructure. Update and refine flood risk reduction measures (floodplain benching and low head dam removal) using post-helene data and modeling, collect geotechnical and engineering data to further inform and explore these measures. Develop a preliminary project plan for implementing measures 1-3, which will include identifying and securing funding, preparation of 30% engineering designs, alternative analysis, outline project tasks and phases, and estimates for cost and schedules.
Town of Canton
Renovation of a 20,000 SF 2-story 1938 Historic Armory, including exterior upgrades (roof replacement, masonry repair, window/door replacement, new lighting) and interior renovations (new masonry walls, refurbished restrooms/kitchen, new finishes, fire sprinkler, mechanical, electrical, and plumbing systems).
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Town of Canton
Close: Dec 18, 2025
Renovation of a 20,000 SF 2-story 1938 Historic Armory, including exterior upgrades (roof replacement, masonry repair, window/door replacement, new lighting) and interior renovations (new masonry walls, refurbished restrooms/kitchen, new finishes, fire sprinkler, mechanical, electrical, and plumbing systems).
Town of Canton
Project consists of approx. Renovation of a 20,000 SF 2-Story 1938 Historic Armory to enhance its resilience against future floods and disasters. Constructed with masonry, steel, and wood, the exterior scope will include replacing the roof, repairing masonry walls, replacing windows and doors, and adding new lighting. The 14,400 SF main level interior renovation will include new masonry walls, refurbished restrooms and kitchen, new resilient finishes, new fire sprinkler system, and new mechanical, electrical, and plumbing systems. The 5,600 SF upper level will mostly remain unchanged and left unoccupied for public use. New mechanical, electrical, and plumbing equipment will be located here with some modifications to infill discarded openings and add new utility access.
Posted Date
Nov 12, 2025
Due Date
Feb 19, 2026
Release: Nov 12, 2025
Town of Canton
Close: Feb 19, 2026
Project consists of approx. Renovation of a 20,000 SF 2-Story 1938 Historic Armory to enhance its resilience against future floods and disasters. Constructed with masonry, steel, and wood, the exterior scope will include replacing the roof, repairing masonry walls, replacing windows and doors, and adding new lighting. The 14,400 SF main level interior renovation will include new masonry walls, refurbished restrooms and kitchen, new resilient finishes, new fire sprinkler system, and new mechanical, electrical, and plumbing systems. The 5,600 SF upper level will mostly remain unchanged and left unoccupied for public use. New mechanical, electrical, and plumbing equipment will be located here with some modifications to infill discarded openings and add new utility access.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.