Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $90,000, use sole source.
Coops: Lead with Sourcewell or BuyBoard to bypass formal bidding (especially over $90,000).
Town of Black Mountain (NC). Sole source is deprioritized; competitive processes are strongly favored.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Town of Black Mountain's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Building Inspector
Town Manager & Interim Finance Director
Recreation Director
Public Works Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Town of Black Mountain
Work includes installation and replacement of storm drainage piping (hdpe and related structures); installation of culverts beneath; construction of concrete headwalls, junction boxes, and drop inlets; reconfiguration and rehabilitation of roadside ditches and grass swales; construction of a stormwater wetland / scm with outlet structures riprap aprons and energy dissipation; asphalt sawcutting and patching; erosion and sediment control measures; restoration, seeding, mulching, and stabilization of disturbed areas; protection of existing utilities, fences, and infrastructure.
Posted Date
-
Due Date
Feb 6, 2026
Town of Black Mountain
Close: Feb 6, 2026
Work includes installation and replacement of storm drainage piping (hdpe and related structures); installation of culverts beneath; construction of concrete headwalls, junction boxes, and drop inlets; reconfiguration and rehabilitation of roadside ditches and grass swales; construction of a stormwater wetland / scm with outlet structures riprap aprons and energy dissipation; asphalt sawcutting and patching; erosion and sediment control measures; restoration, seeding, mulching, and stabilization of disturbed areas; protection of existing utilities, fences, and infrastructure.
AvailableTown of Black Mountain
Work includes sistering and reinforcing floor joists, installing headers, stud packs, blocking, repairing penetrations, installing required connectors and hardware, and constructing temporary shoring where approved.
Posted Date
-
Due Date
Jan 21, 2026
Town of Black Mountain
Close: Jan 21, 2026
Work includes sistering and reinforcing floor joists, installing headers, stud packs, blocking, repairing penetrations, installing required connectors and hardware, and constructing temporary shoring where approved.
Town of Black Mountain
Work includes full replacement of two golf cart bridges. Provide full demolition, removal, engineering, fabrication, & installation of two new golf cart/pedestrian bridges. Remove existing bridge superstructures (steel girders, decking, nailers). Remove concrete abutments and footings where compromised. Maintain environmental controls during demolition. Provide signed and sealed engineering drawings, including structural, civil, and geotechnical components. New reinforced concrete abutments resistant to scour and overtopping. Galvanized or weathering steel girders. Composite or pressure-treated decking system. See outside link.
Posted Date
Dec 5, 2025
Due Date
Feb 6, 2026
Release: Dec 5, 2025
Town of Black Mountain
Close: Feb 6, 2026
Work includes full replacement of two golf cart bridges. Provide full demolition, removal, engineering, fabrication, & installation of two new golf cart/pedestrian bridges. Remove existing bridge superstructures (steel girders, decking, nailers). Remove concrete abutments and footings where compromised. Maintain environmental controls during demolition. Provide signed and sealed engineering drawings, including structural, civil, and geotechnical components. New reinforced concrete abutments resistant to scour and overtopping. Galvanized or weathering steel girders. Composite or pressure-treated decking system. See outside link.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.