Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Timber Lakes Water Special Service District
Project consists of the furnishing of materials, equipment, and subcontract work for the gas upgrading building and ancillary structures. Specific features include, but are not limited to: construction of new waste gas burner facility, including condensate sump. Construction of new biogas upgrading facility. Scada and automation systems for the new facilities. Roads, sidewalks, yard piping, and site improvements. Provision of project record documents, including drawings, operations and maintenance manuals and other documents. See attached file.
Posted Date
Jun 5, 2026
Due Date
Jul 10, 2026
Release: Jun 5, 2026
Timber Lakes Water Special Service District
Close: Jul 10, 2026
Project consists of the furnishing of materials, equipment, and subcontract work for the gas upgrading building and ancillary structures. Specific features include, but are not limited to: construction of new waste gas burner facility, including condensate sump. Construction of new biogas upgrading facility. Scada and automation systems for the new facilities. Roads, sidewalks, yard piping, and site improvements. Provision of project record documents, including drawings, operations and maintenance manuals and other documents. See attached file.
AvailableTimber Lakes Water Special Service District
Project consists of complete anaerobic digester foundations; erect egg-shaped digester tanks, test tanks, and install coatings and insulation. Complete digester building, stair tower, and elevated walkways structural construction above elevation 4500; complete sludge storage tank above elevation 4500. 00, including cover installation. See attached file.
Posted Date
Sep 12, 2025
Due Date
Oct 9, 2025
Release: Sep 12, 2025
Timber Lakes Water Special Service District
Close: Oct 9, 2025
Project consists of complete anaerobic digester foundations; erect egg-shaped digester tanks, test tanks, and install coatings and insulation. Complete digester building, stair tower, and elevated walkways structural construction above elevation 4500; complete sludge storage tank above elevation 4500. 00, including cover installation. See attached file.
Timber Lakes Water Special Service District
Primary Filter Equipment.
Posted Date
Aug 3, 2025
Due Date
Aug 7, 2025
Release: Aug 3, 2025
Timber Lakes Water Special Service District
Close: Aug 7, 2025
Primary Filter Equipment.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Timber Lakes Water Special Service District
The board discussed the resignation of a county council member and the appointment of a replacement. The Timber Lakes POA liaison announced an upcoming fire safety day and requested the water company's attendance. The board approved the monthly warrant list and credit card payments. Additionally, the board ratified previous payroll periods, tabled discussions regarding fire-hydrant and water usage extensions until the following month, and held an executive session to discuss personnel matters.
The board meeting focused on several operational and administrative topics. Discussion included the transition of the POA liaison role and the utilization of hydrant data for capital improvement planning. The board reviewed and approved the warrant list, including credit card payments, and ratified payroll for recent pay periods. The Manager report covered the implementation of a new cybersecurity task list, system telemetry updates, and progress on cloud-based data backups. Additionally, the board discussed peak day demand reporting, ongoing PFAS and manganese water testing, the progress of water valve GPS mapping, and the solicitation of bids for water tank maintenance. The board also held an executive session to discuss personnel matters.
The board meeting included a review of hydrant agreements and water work orders. The board approved the monthly warrant list and ratified payroll for specified periods. A presentation on cybersecurity provided an assessment of the district's posture and recommended security enhancements, including domain registration and authentication improvements. Discussions were held regarding the development of new springs to address water flow issues during dry seasons, with plans to consult contractors and prepare documentation for an RFP. Additionally, an executive session was held to discuss collective bargaining and accounts receivable.
The board meeting included the approval of March warrants, the ratification of February and March payroll periods, and a manager report covering cybersecurity initiatives, SCADA system computer installations, and maintenance projects such as painting a water tank and shop garage doors. Additionally, the board entered an executive session to discuss personnel matters before adjourning the meeting.
The meeting included the election of new officers for 2026, with Neil Anderton nominated as chair, John Blickenstaff as vice chair, Michael Wheelwright as treasurer, and Mike Durr as clerk. The manager's report covered monitoring of manganese levels, satisfaction from a property owner regarding tree removal during the capital project, and notification that the District will receive the Best Customer Service award from the Rural Water Association. The board also entered an executive session to discuss collective bargaining regarding the district's current engineers.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Timber Lakes Water Special Service District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge